Waste Water Engineering pH value of sludge during alkaline regression stage, is More than 7 More than 6 Less than 6 Less than 7 More than 7 More than 6 Less than 6 Less than 7 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 2 days 12 days 14 days 7 days 2 days 12 days 14 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For providing an Indian type W.C., the R.C.C. slabs in the toilet portion Should be sunk by 20 cm Should be kept 20 cm above the adjacent portion Should be sunk by 50 cm Need not be sunk Should be sunk by 20 cm Should be kept 20 cm above the adjacent portion Should be sunk by 50 cm Need not be sunk ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering At the junction of sewers Top of larger sewer is kept lower Top of smaller sewer is kept lower None of these Tops of both the sewers are at the same level Top of larger sewer is kept lower Top of smaller sewer is kept lower None of these Tops of both the sewers are at the same level ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The normal values of over flow rates for secondary sedimentation tanks, ranges between 80,000 to 10,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 80,000 to 10,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The non-clog pump which permits solid matter to pass out with the liquid sewage, is Centrifugal pump Reciprocating pump None of these Pneumatic ejector Centrifugal pump Reciprocating pump None of these Pneumatic ejector ANSWER DOWNLOAD EXAMIANS APP