Waste Water Engineering
In the activated sludge process

Aeration is continued till stability
Sludge is activated by constant stirring
Aeration is done with an admixture of previously aerated sludge
Water is removed by centrifugal action

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The sewers

Must be laid at least 2 to 3 m deep to collect /water from the basements
Must be of adequate size to avoid over flow
All listed here
Must flow under gravity ½ to ¾ full

ANSWER DOWNLOAD EXAMIANS APP