Waste Water Engineering The minimum recommended diameter of sewers, is 15 cm 10 cm 5 cm 20 cm 15 cm 10 cm 5 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a sludge tank, the gas mainly produced, is Nitrogen Oxygen Carbon dioxide Hydrogen Nitrogen Oxygen Carbon dioxide Hydrogen ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 2 days 14 days 7 days 12 days 2 days 14 days 7 days 12 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Ventilating shafts are provided to a sewer line at every 150 m 200 m 300 m 100 m 150 m 200 m 300 m 100 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewers Must be of adequate size to avoid over flow Must flow under gravity ½ to ¾ full Must be laid at least 2 to 3 m deep to collect /water from the basements All listed here Must be of adequate size to avoid over flow Must flow under gravity ½ to ¾ full Must be laid at least 2 to 3 m deep to collect /water from the basements All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which one of the following statements regarding septic tanks is wrong? A gap of 7.5 cm between the bottom of the covering slab and the top level of scum is provided The outlet invert level is kept 5 to 7.5 cm below the inlet invert level The minimum width of septic level is 90 cm The depth of tank is kept equal to its width A gap of 7.5 cm between the bottom of the covering slab and the top level of scum is provided The outlet invert level is kept 5 to 7.5 cm below the inlet invert level The minimum width of septic level is 90 cm The depth of tank is kept equal to its width ANSWER DOWNLOAD EXAMIANS APP