Waste Water Engineering The minimum recommended diameter of sewers, is 10 cm 5 cm 20 cm 15 cm 10 cm 5 cm 20 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering With self cleansing velocity in sewers Scouring occurs at bottom Neither silting nor scouring occurs at bottom Silting occurs at bottom Both silting and scouring occur at bottom Scouring occurs at bottom Neither silting nor scouring occurs at bottom Silting occurs at bottom Both silting and scouring occur at bottom ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In trickling filter, B.O.D. is reduced to 40 to 60% 60 to 80% 30 to 40% 80 to 90% 40 to 60% 60 to 80% 30 to 40% 80 to 90% ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During preliminary treatment of a sewage Girt and sand are removed by girt chambers Oil and grease are removed from skimming tanks Floating materials are removed by screening All listed here Girt and sand are removed by girt chambers Oil and grease are removed from skimming tanks Floating materials are removed by screening All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering hydraulically equivalent, the relationship which holds good, is D3/2 = 4 b3/2 D3/8 = 4 b3/8 D2/3 = 4 b2/3 D8/3 = 4 b8/3 D3/2 = 4 b3/2 D3/8 = 4 b3/8 D2/3 = 4 b2/3 D8/3 = 4 b8/3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The laying of sewers is done with Level Clinometer Magnetic compass Theodolite Level Clinometer Magnetic compass Theodolite ANSWER DOWNLOAD EXAMIANS APP