Waste Water Engineering During preliminary treatment of a sewage Oil and grease are removed from skimming tanks All listed here Floating materials are removed by screening Girt and sand are removed by girt chambers Oil and grease are removed from skimming tanks All listed here Floating materials are removed by screening Girt and sand are removed by girt chambers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For estimating the peak run off the rational formula Q = 0.0278 KpA was evolved by All listed here Kinchling Lloyd Davis Frubling All listed here Kinchling Lloyd Davis Frubling ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sludge banks are formed if sewage is disposed of in Seas Lakes Rivers None of these Seas Lakes Rivers None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewage, the solids in mg per litre is 1500 to 2000 1000 to 1500 100 to 500 500 to 1000 1500 to 2000 1000 to 1500 100 to 500 500 to 1000 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of 120 cm 160 cm 100 cm 140 cm 120 cm 160 cm 100 cm 140 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most effective arrangement for diverting excess storm water into a natural drainage, is Siphon spill way Overflow weir Leaping weir None of these Siphon spill way Overflow weir Leaping weir None of these ANSWER DOWNLOAD EXAMIANS APP