Waste Water Engineering During preliminary treatment of a sewage All listed here Girt and sand are removed by girt chambers Floating materials are removed by screening Oil and grease are removed from skimming tanks All listed here Girt and sand are removed by girt chambers Floating materials are removed by screening Oil and grease are removed from skimming tanks ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Maximum permissible velocity 1.5 m/sec, is adopted in drains With beds of rocks and gravels Neither A. nor B. Lined with stones Both A. and B. With beds of rocks and gravels Neither A. nor B. Lined with stones Both A. and B. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The coagulant which is generally not used for treating the sewage, is Ferric chloride Alum Chlorinated coppers Ferric sulphate Ferric chloride Alum Chlorinated coppers Ferric sulphate ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 15 cumecs, the depth d and width are related by For drains up to B = 0.5 d d = 0.2 B B = 0.2 d d = 0.5 B B = 0.5 d d = 0.2 B B = 0.2 d d = 0.5 B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In the activated sludge process Sludge is activated by constant stirring Water is removed by centrifugal action Aeration is continued till stability Aeration is done with an admixture of previously aerated sludge Sludge is activated by constant stirring Water is removed by centrifugal action Aeration is continued till stability Aeration is done with an admixture of previously aerated sludge ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewerage system originates from Main sewers House sewers Branch sewers Lateral sewers Main sewers House sewers Branch sewers Lateral sewers ANSWER DOWNLOAD EXAMIANS APP