Waste Water Engineering During preliminary treatment of a sewage All listed here Floating materials are removed by screening Oil and grease are removed from skimming tanks Girt and sand are removed by girt chambers All listed here Floating materials are removed by screening Oil and grease are removed from skimming tanks Girt and sand are removed by girt chambers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In normal conditions, the period for sludge digestion, is 20 days 10 days 60 days 30 days 20 days 10 days 60 days 30 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Pick up the incorrect size of stone ware sewers 82.5 cm None of these 52.5 cm 67.5 cm 82.5 cm None of these 52.5 cm 67.5 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewers the highest non-scouring velocity is achieved in Stone ware sewers Cast iron sewers Cement concrete sewers Glazed bricks sewers Stone ware sewers Cast iron sewers Cement concrete sewers Glazed bricks sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Setting out the alignments of sewers may start from City Tail end Any point Out-fall City Tail end Any point Out-fall ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Stone ware pipes are Highly resistant to sulphide corrosion Hydraulically efficient because of their smooth interior surface Highly impervious Especially suited to pressure pipes Highly resistant to sulphide corrosion Hydraulically efficient because of their smooth interior surface Highly impervious Especially suited to pressure pipes ANSWER DOWNLOAD EXAMIANS APP