Waste Water Engineering
During preliminary treatment of a sewage

Floating materials are removed by screening
Oil and grease are removed from skimming tanks
All listed here
Girt and sand are removed by girt chambers

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
In septic tanks,

Free board of 0.3 m may be provided
The clear space between the baffle top and covering slab is about 7.5 cm
All listed here
The baffles or tees are extended up to top level of scum

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Nitrogen cycle of sewage, is

Liberation of ammonia-formation of nitrites-formation of nitrates-liberation of nitrogen
Liberation of nitrogen-formation of nitrates-formation of nitrites-liberation of ammonia
Liberation of nitrogen-liberation of ammonia-formation of nitrites- formation of nitrates
Formation of nitrates-formation of nitrites-liberation of nitrates-liberation of nitrates

ANSWER DOWNLOAD EXAMIANS APP