Waste Water Engineering During preliminary treatment of a sewage Girt and sand are removed by girt chambers All listed here Oil and grease are removed from skimming tanks Floating materials are removed by screening Girt and sand are removed by girt chambers All listed here Oil and grease are removed from skimming tanks Floating materials are removed by screening ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at Full depth Three fourth full Half full Two third full Full depth Three fourth full Half full Two third full ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which resists sulphide corrosion, is Cast iron sewer Lead sewer Brick sewer R.C. sewer Cast iron sewer Lead sewer Brick sewer R.C. sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If a 2% solution of sewage sample is incubated for 5 days at 20°C and the dissolved oxygen depletion was found to be 8 mg/l. The BOD of the sewage is 200 mg/l 100 mg/l 300 mg/l 400 mg/l 200 mg/l 100 mg/l 300 mg/l 400 mg/l ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a residential colony, sewers of diameters 100 mm, 150 mm and 225 mm were laid with a gradient 1 in 120. Which portion of the sewage system does not choke in due course of time? 225 mm dia 100 mm dia All of these 150 mm dia 225 mm dia 100 mm dia All of these 150 mm dia ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Boussinesq’s equation for ascertaining unit pressure at a depth on sewers due to traffic loads, is pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 ANSWER DOWNLOAD EXAMIANS APP