Waste Water Engineering The non-clog pump which permits solid matter to pass out with the liquid sewage, is Centrifugal pump None of these Pneumatic ejector Reciprocating pump Centrifugal pump None of these Pneumatic ejector Reciprocating pump ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sludge banks are formed if sewage is disposed of in None of these Lakes Seas Rivers None of these Lakes Seas Rivers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sludge does not contain waste water from Bath rooms Kitchen sinks Wash basins Toilets Bath rooms Kitchen sinks Wash basins Toilets ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 2 days 7 days 12 days 14 days 2 days 7 days 12 days 14 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a fully mechanised composting plant, involves Mechanized receipt Mechanized segregation Mechanized pulverising of refuse All of these Mechanized receipt Mechanized segregation Mechanized pulverising of refuse All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The gas evolved in sewers is All of these Carbondioxide Hydrogen sulphide Methane All of these Carbondioxide Hydrogen sulphide Methane ANSWER DOWNLOAD EXAMIANS APP