Waste Water Engineering If is the diameter of upper circular portion, the overall depth of New Egg shaped sewer section, is 1.350 D 1.250 D 1.625 D 1.425 D 1.350 D 1.250 D 1.625 D 1.425 D ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The screens are fixed Parallel to the direction of flow At an angle 30° to 60° to the direction of flow Perpendicular to the direction of flow None of these Parallel to the direction of flow At an angle 30° to 60° to the direction of flow Perpendicular to the direction of flow None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Acid regression stage of sludge digestion at a temperature 21°C extends over a period of 90 days 15 days 30 days 60 days 90 days 15 days 30 days 60 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Inter-distance between ventilation columns in a sewer line is kept 50 m to 100 m 25 to 50 m 100 m to 150 m 150 m to 300 m 50 m to 100 m 25 to 50 m 100 m to 150 m 150 m to 300 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering It is customary to design a sewer for D.W.F. on the basis of Twice the average demand Average demand Thrice the average demand Four times the average demand Twice the average demand Average demand Thrice the average demand Four times the average demand ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In case of sewer lines All listed here Obstruction test is carried out with the help of smooth ball of diameter 13 mm Water test is carried out to check water tightness of the joints Test for straightness is carried out with the help of a lamp and mirror All listed here Obstruction test is carried out with the help of smooth ball of diameter 13 mm Water test is carried out to check water tightness of the joints Test for straightness is carried out with the help of a lamp and mirror ANSWER DOWNLOAD EXAMIANS APP