Waste Water Engineering If is the diameter of upper circular portion, the overall depth of New Egg shaped sewer section, is 1.350 D 1.625 D 1.250 D 1.425 D 1.350 D 1.625 D 1.250 D 1.425 D ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 8 to 16 hours 24 to 36 hours 16 to 24 hours 4 to 8 hours 8 to 16 hours 24 to 36 hours 16 to 24 hours 4 to 8 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Clogging of sewers, is caused due to Low discharge Silting All of these Greasy and oily matters Low discharge Silting All of these Greasy and oily matters ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which one of the following tests is used for testing sewer pipes? Mirror test Water test All of these Ball test Mirror test Water test All of these Ball test ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of man holes along a straight portion of a sewer is 300 m, the diameter of the sewer may be > 1.5 m 1.5 m 0.9 cm 1.2 m > 1.5 m 1.5 m 0.9 cm 1.2 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Flocculated particles do not change their Weight Size Shape None of these Weight Size Shape None of these ANSWER DOWNLOAD EXAMIANS APP