Waste Water Engineering If is the diameter of upper circular portion, the overall depth of New Egg shaped sewer section, is 1.250 D 1.350 D 1.425 D 1.625 D 1.250 D 1.350 D 1.425 D 1.625 D ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a fully mechanised composting plant, involves All of these Mechanized pulverising of refuse Mechanized segregation Mechanized receipt All of these Mechanized pulverising of refuse Mechanized segregation Mechanized receipt ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a sludge tank, the gas mainly produced, is Oxygen Carbon dioxide Nitrogen Hydrogen Oxygen Carbon dioxide Nitrogen Hydrogen ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for A particle to travel from top surface to bottom sludge zone A particle to travel along its length The flow of sewage to fill the tank None of these A particle to travel from top surface to bottom sludge zone A particle to travel along its length The flow of sewage to fill the tank None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer manholes are generally provided at All of these The change of gradient The change of direction The junctions of sewers All of these The change of gradient The change of direction The junctions of sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Aerobic bacterias Flourish in the presence of free oxygen All of these Consume organic matter as their food Oxidise organic matter in sewage Flourish in the presence of free oxygen All of these Consume organic matter as their food Oxidise organic matter in sewage ANSWER DOWNLOAD EXAMIANS APP