Waste Water Engineering If is the diameter of upper circular portion, the overall depth of New Egg shaped sewer section, is 1.250 D 1.350 D 1.625 D 1.425 D 1.250 D 1.350 D 1.625 D 1.425 D ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer pipes Should resist the wear and tear caused due to abrasion Carry sewage as gravity conduits All listed here Are designed for generating self-cleansing velocities at different discharge Should resist the wear and tear caused due to abrasion Carry sewage as gravity conduits All listed here Are designed for generating self-cleansing velocities at different discharge ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In the activated sludge process Aeration is continued till stability Sludge is activated by constant stirring Aeration is done with an admixture of previously aerated sludge Water is removed by centrifugal action Aeration is continued till stability Sludge is activated by constant stirring Aeration is done with an admixture of previously aerated sludge Water is removed by centrifugal action ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The dimensions of a rectangular settling tank are: length 24 m, width 6 m and depth 3 m. If 2 hour detention period for tanks is recommended, the rate of flow of sewage per hour, is 212 cu.m 204 cu.m 216 cu.m 208 cu.m 212 cu.m 204 cu.m 216 cu.m 208 cu.m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Depletion of ozone layer in the outer atmosphere may cause Lung cancer Bronchitis Skin cancer Heart disorder Lung cancer Bronchitis Skin cancer Heart disorder ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum diameter of sewers adopted in the designs is 1.0 m 3.0 m 4.0 m 2.0 m 1.0 m 3.0 m 4.0 m 2.0 m ANSWER DOWNLOAD EXAMIANS APP