Waste Water Engineering For large sewers, maximum distance between manholes may be 100 m 50 m 300 m 200 m 100 m 50 m 300 m 200 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewers All listed here Must be laid at least 2 to 3 m deep to collect /water from the basements Must be of adequate size to avoid over flow Must flow under gravity ½ to ¾ full All listed here Must be laid at least 2 to 3 m deep to collect /water from the basements Must be of adequate size to avoid over flow Must flow under gravity ½ to ¾ full ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering To prevent settling down of sewage both at the bottom and on the sides of a large sewer, self-cleaning velocity recommended for Indian conditions, is 0.60 m/sec 0.70 m/sec 0.50 m/sec 0.75 m/sec 0.60 m/sec 0.70 m/sec 0.50 m/sec 0.75 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Antisyphonage pipe is fitted On manholes At the beginning of sewer line With a W.'trap At the end of septic tanks On manholes At the beginning of sewer line With a W.'trap At the end of septic tanks ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Aerobic bacterias Consume organic matter as their food Flourish in the presence of free oxygen All of these Oxidise organic matter in sewage Consume organic matter as their food Flourish in the presence of free oxygen All of these Oxidise organic matter in sewage ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Boussinesq’s equation for ascertaining unit pressure at a depth on sewers due to traffic loads, is pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 ANSWER DOWNLOAD EXAMIANS APP