Waste Water Engineering The spacing of bars for perforations in coarse screens used for the treatment of sewage, is 20 mm 30 mm 50 mm 40 mm 20 mm 30 mm 50 mm 40 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If is the diameter of upper circular portion, the overall depth of New Egg shaped sewer section, is 1.425 D 1.625 D 1.350 D 1.250 D 1.425 D 1.625 D 1.350 D 1.250 D ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Pick up the incorrect statement from the following for allowing workers to enter sewers The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes The men entering the manhole should be advised to smoke in the sewer Warning signals should be erected Proper tests for the presence of poisonous gases must be carried out The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes The men entering the manhole should be advised to smoke in the sewer Warning signals should be erected Proper tests for the presence of poisonous gases must be carried out ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at Half full Full depth Two third full Three fourth full Half full Full depth Two third full Three fourth full ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a grit chamber, if the recommended velocity of flow is 0.2 m/sec and detention period is 2 minutes, the length of the tank, is 30 m 20 m 16 m 24 m 30 m 20 m 16 m 24 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, Detention period is kept 3 to 4 minutes Flow velocity is kept 0.09 m/sec Organic and inorganic materials are separated All listed here Detention period is kept 3 to 4 minutes Flow velocity is kept 0.09 m/sec Organic and inorganic materials are separated All listed here ANSWER DOWNLOAD EXAMIANS APP