Waste Water Engineering The spacing of bars for perforations in coarse screens used for the treatment of sewage, is 50 mm 20 mm 40 mm 30 mm 50 mm 20 mm 40 mm 30 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering At the junction of sewers None of these Top of larger sewer is kept lower Tops of both the sewers are at the same level Top of smaller sewer is kept lower None of these Top of larger sewer is kept lower Tops of both the sewers are at the same level Top of smaller sewer is kept lower ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewers designed with self cleansing velocity, Both silting and scouring occur at the bottom Neither silting nor scouring occurs at the bottom The bottom is silted The bottom is scoured Both silting and scouring occur at the bottom Neither silting nor scouring occurs at the bottom The bottom is silted The bottom is scoured ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In very first stage of decomposition of the organic matter in sewage Nitrates are formed Ammonia is formed Carbondioxide is formed Nitrites are formed Nitrates are formed Ammonia is formed Carbondioxide is formed Nitrites are formed ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For trunk sewers more than 1.25 m in diameter, the ratio of the maximum daily sewage flow to the average daily sewage flow is assumed 2 3 1.5 2.5 2 3 1.5 2.5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Inter-distance between ventilation columns in a sewer line is kept 150 m to 300 m 100 m to 150 m 25 to 50 m 50 m to 100 m 150 m to 300 m 100 m to 150 m 25 to 50 m 50 m to 100 m ANSWER DOWNLOAD EXAMIANS APP