Waste Water Engineering At the junction of sewers None of these Top of larger sewer is kept lower Top of smaller sewer is kept lower Tops of both the sewers are at the same level None of these Top of larger sewer is kept lower Top of smaller sewer is kept lower Tops of both the sewers are at the same level ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit and silt of the grit chambers, may not be used for Neither A nor B Raising low lying areas by dumping Concreting Both A and B Neither A nor B Raising low lying areas by dumping Concreting Both A and B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 4 to 8 hours 24 to 36 hours 8 to 16 hours 16 to 24 hours 4 to 8 hours 24 to 36 hours 8 to 16 hours 16 to 24 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The density of population over 40 hectares is 250/hectare. If water supply demand per day is 200 litres and sewage discharge is 80% of water supply, the sewage flow in sewers of separate system, is 0.05554 cumec 0.0556 cumec 0.05552 cumec 0.05556 cumec 0.05554 cumec 0.0556 cumec 0.05552 cumec 0.05556 cumec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a city the ratio of the drainage to sewage is 20, the percentage discharge passing through non-monsoon periods, is 5 20 15 10 5 20 15 10 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Cement concrete sewers are only suitable if non-scouring velocity is between 3.0 to 4.0 m/sec 3.5 to 4.5 m/sec 4.5 to 5.5 m/sec 2.5 to 3.0 m/sec 3.0 to 4.0 m/sec 3.5 to 4.5 m/sec 4.5 to 5.5 m/sec 2.5 to 3.0 m/sec ANSWER DOWNLOAD EXAMIANS APP