Waste Water Engineering At the junction of sewers Top of smaller sewer is kept lower Top of larger sewer is kept lower Tops of both the sewers are at the same level None of these Top of smaller sewer is kept lower Top of larger sewer is kept lower Tops of both the sewers are at the same level None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The pressure exerted by The internal pressure if any, causes tensile stress in the pipe material All listed here The sewage when running full from inside, is called internal pressure Pressure sewers are designed to be safe in tension The internal pressure if any, causes tensile stress in the pipe material All listed here The sewage when running full from inside, is called internal pressure Pressure sewers are designed to be safe in tension ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 16 to 24 hours 8 to 16 hours 4 to 8 hours 24 to 36 hours 16 to 24 hours 8 to 16 hours 4 to 8 hours 24 to 36 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The gradient of sewers depends upon Diameter of the sewer All listed here Velocity of flow Discharge Diameter of the sewer All listed here Velocity of flow Discharge ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In R.C. sewer pipes, the percentage longitudinal reinforcement to the cross-sectional area of concrete is kept 5 2 0.25 10 5 2 0.25 10 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A cylindrical ejector having its height 2 m fills after every 10 minutes with a peak sewage discharge of 0.0157 cumec. The diameter of the ejector chamber, is 2.45 m 2.40 m 2.30 m 2.50 m 2.45 m 2.40 m 2.30 m 2.50 m ANSWER DOWNLOAD EXAMIANS APP