Waste Water Engineering At the junction of sewers Tops of both the sewers are at the same level None of these Top of larger sewer is kept lower Top of smaller sewer is kept lower Tops of both the sewers are at the same level None of these Top of larger sewer is kept lower Top of smaller sewer is kept lower ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Boussinesq’s equation for ascertaining unit pressure at a depth on sewers due to traffic loads, is pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The laying of sewers is done with Magnetic compass Theodolite Level Clinometer Magnetic compass Theodolite Level Clinometer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Pick up the incorrect size of stone ware sewers None of these 52.5 cm 82.5 cm 67.5 cm None of these 52.5 cm 82.5 cm 67.5 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of bars of perforations of fine screens used for the treatment of sewage, is 5 to 8 mm 3 to 5 mm 2 to 3 mm 8 to 10 mm 5 to 8 mm 3 to 5 mm 2 to 3 mm 8 to 10 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum diameter of sewers adopted in the designs is 2.0 m 1.0 m 4.0 m 3.0 m 2.0 m 1.0 m 4.0 m 3.0 m ANSWER DOWNLOAD EXAMIANS APP