Waste Water Engineering At the junction of sewers None of these Top of smaller sewer is kept lower Tops of both the sewers are at the same level Top of larger sewer is kept lower None of these Top of smaller sewer is kept lower Tops of both the sewers are at the same level Top of larger sewer is kept lower ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If is the diameter of upper circular portion, the overall depth of New Egg shaped sewer section, is 1.250 D 1.350 D 1.425 D 1.625 D 1.250 D 1.350 D 1.425 D 1.625 D ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewers Must be laid at least 2 to 3 m deep to collect /water from the basements Must flow under gravity ½ to ¾ full Must be of adequate size to avoid over flow All listed here Must be laid at least 2 to 3 m deep to collect /water from the basements Must flow under gravity ½ to ¾ full Must be of adequate size to avoid over flow All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a city the ratio of the drainage to sewage is 20, the percentage discharge passing through non-monsoon periods, is 10 5 15 20 10 5 15 20 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The average temperature of sewage in India, is 25°C 20°C 15°C 10°C 25°C 20°C 15°C 10°C ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer that unloads the sewage at the point of treatment is called Branch sewer Main sewer House sewer Outfall sewer Branch sewer Main sewer House sewer Outfall sewer ANSWER DOWNLOAD EXAMIANS APP