Waste Water Engineering At the junction of sewers Top of smaller sewer is kept lower Top of larger sewer is kept lower None of these Tops of both the sewers are at the same level Top of smaller sewer is kept lower Top of larger sewer is kept lower None of these Tops of both the sewers are at the same level ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For drainage pipes in buildings the test applied before putting them to use, is All listed here Smoke test Straightness test Water test All listed here Smoke test Straightness test Water test ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewerage system consists of Lateral sewer House sewer Branch sewer All of these Lateral sewer House sewer Branch sewer All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In the activated sludge process Aeration is continued till stability Sludge is activated by constant stirring Water is removed by centrifugal action Aeration is done with an admixture of previously aerated sludge Aeration is continued till stability Sludge is activated by constant stirring Water is removed by centrifugal action Aeration is done with an admixture of previously aerated sludge ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum spacing of manholes specified by Indian standard in sewers upto 0.3 m diameter is 20 m 45 m 75 m 30 m 20 m 45 m 75 m 30 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the discharge of a sewer running half is 628 1.p.s., i = 0.001, and n = 0.010, the diameter of the sewer, is 1.69 m 1.49 m 1.39 m 1.59 m 1.69 m 1.49 m 1.39 m 1.59 m ANSWER DOWNLOAD EXAMIANS APP