The rational formula for peak drainage discharge, was evolved by

All of these
Lloyd David
Fruhling
Kuichling

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
In R.C. sewer pipes, the percentage longitudinal reinforcement to the cross-sectional area of concrete is kept

10
2
0.25
5

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Chlorination of water is done for the removal of

Suspended solids
Sediments
Bacterias
Hardness

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
If the depletion of oxygen is found to be 2.5 mg/litre after incubating 2.5 ml of sewage diluted to 250 ml for 5 days at 20°C, B.O.D. of the sewage is

250 mg/l
50 mg/l
100 mg/l
150 mg/l

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The spacing of bars of perforations of fine screens used for the treatment of sewage, is

8 to 10 mm
5 to 8 mm
2 to 3 mm
3 to 5 mm

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The effluent of a septic tank is

As good as that from a complete treatment
Foul and contains dissolved and suspended solids
None of these
Fit for discharge into any open drain

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Waste Water Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑