Waste Water Engineering The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known Branch sewer House sewer Lateral sewer Sewer outfall Branch sewer House sewer Lateral sewer Sewer outfall ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The drainage area of a town is 12 hectares. Its 40% area is hard pavement ( K = 0.85), the 40% area is unpaved streets (K = 0.20) and the remaining is wooded areas (K = 0.15). Assuming the time of concentration for the areas as 30 minutes and using the formula Ps = 900/(t + 60) the maximum run off is 0.12 cumec 0.15 cumec 0.20 cumec 0.10 cumec 0.12 cumec 0.15 cumec 0.20 cumec 0.10 cumec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During purification process of sewage the gas given off, is Hydrogen All listed here Carbon dioxide Ammonia Hydrogen All listed here Carbon dioxide Ammonia ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering To prevent settling down of sewage both at the bottom and on the sides of a large sewer, self-cleaning velocity recommended for Indian conditions, is 0.75 m/sec 0.60 m/sec 0.50 m/sec 0.70 m/sec 0.75 m/sec 0.60 m/sec 0.50 m/sec 0.70 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 1 5 to 10 2 to 3 3 to 5 1 5 to 10 2 to 3 3 to 5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 24 to 36 hours 8 to 16 hours 4 to 8 hours 16 to 24 hours 24 to 36 hours 8 to 16 hours 4 to 8 hours 16 to 24 hours ANSWER DOWNLOAD EXAMIANS APP