Waste Water Engineering The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known Lateral sewer Sewer outfall House sewer Branch sewer Lateral sewer Sewer outfall House sewer Branch sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Setting out the alignments of sewers may start from Out-fall City Any point Tail end Out-fall City Any point Tail end ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The formula which accepts the value of rugosity coefficient n = 0.012 to be used in Manning’s formula, is given by William-Hazen Crimp and Bruges Kutter Bazin William-Hazen Crimp and Bruges Kutter Bazin ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is 1 hour 1 hour and 30 minutes 2 hours 30 minutes 1 hour 1 hour and 30 minutes 2 hours 30 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The reduced levels of the string at the consecutive sight rails A and B are 203.575 m, 203.475 m respectively. If the difference of their R.D.s is 10 m, the gradient of the sewer line is 1 in 100 downward 1 in 500 upward 1 in 503 upward 1 in 100 upward 1 in 100 downward 1 in 500 upward 1 in 503 upward 1 in 100 upward ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of bars for perforations in coarse screens used for the treatment of sewage, is 30 mm 20 mm 50 mm 40 mm 30 mm 20 mm 50 mm 40 mm ANSWER DOWNLOAD EXAMIANS APP