Waste Water Engineering The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known Sewer outfall House sewer Lateral sewer Branch sewer Sewer outfall House sewer Lateral sewer Branch sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum spacing of manholes specified by Indian standard in sewers upto 0.3 m diameter is 45 m 75 m 30 m 20 m 45 m 75 m 30 m 20 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The amount of oxygen consumed by the aerobic bacterias which cause the aerobic biological decomposition of sewage, is known None of these Dissolved Oxygen (D.O.) Chemical Oxygen Demand (C.O.D.) Bio-Chemical Oxygen Demand (B.O.D.) None of these Dissolved Oxygen (D.O.) Chemical Oxygen Demand (C.O.D.) Bio-Chemical Oxygen Demand (B.O.D.) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 2 to 3 3 to 5 5 to 10 1 2 to 3 3 to 5 5 to 10 1 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 3.0 ml of raw sewage is diluted to 300 ml. The D.O. concentration of the diluted sample at the beginning of the test was 8 mg/l. After 5 day-incubation at 20°C, the D.O. concentration was 5 mg/l. The BOD of raw sewerage is 200 mg/l 300 mg/l 100 mg/l 400 mg/l 200 mg/l 300 mg/l 100 mg/l 400 mg/l ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For house drainage minimum gradient is 1 in 400 1 in 10 1 in 60 1 in 80 1 in 400 1 in 10 1 in 60 1 in 80 ANSWER DOWNLOAD EXAMIANS APP