Waste Water Engineering Which one of the following tests is used for testing sewer pipes? Water test Mirror test Ball test All of these Water test Mirror test Ball test All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The intensity of rain is expressed in cm/day None of these cm/hour cm/minute cm/day None of these cm/hour cm/minute ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering An inverted siphon is designed generally for Three pipes Two pipes Four pipes One pipe Three pipes Two pipes Four pipes One pipe ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The pressure exerted by Pressure sewers are designed to be safe in tension The internal pressure if any, causes tensile stress in the pipe material All listed here The sewage when running full from inside, is called internal pressure Pressure sewers are designed to be safe in tension The internal pressure if any, causes tensile stress in the pipe material All listed here The sewage when running full from inside, is called internal pressure ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The layers of vegetable wastes and night soil alternatively piled above the ground to form a mound, is called None of these Windrow Plateau A heap None of these Windrow Plateau A heap ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In very first stage of decomposition of the organic matter in sewage Nitrates are formed Carbondioxide is formed Nitrites are formed Ammonia is formed Nitrates are formed Carbondioxide is formed Nitrites are formed Ammonia is formed ANSWER DOWNLOAD EXAMIANS APP