Waste Water Engineering When drainage to sewage ratio is 20, the peak dry weather flow is 20% of the design discharge Slightly more than 5% of the design discharge Slightly less than 5% of the design discharge None of these 20% of the design discharge Slightly more than 5% of the design discharge Slightly less than 5% of the design discharge None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit and silt of the grit chambers, may not be used for Both A and B Concreting Raising low lying areas by dumping Neither A nor B Both A and B Concreting Raising low lying areas by dumping Neither A nor B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Hume steel pipes are Both B and C Steel shell coated from outside with cement mortar Steel pipes Steel shell coated from inside with cement mortar Both B and C Steel shell coated from outside with cement mortar Steel pipes Steel shell coated from inside with cement mortar ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Primary treatment of sewage consists of removal of Oil and grease Sand and girt Large suspended organic solids Floating materials Oil and grease Sand and girt Large suspended organic solids Floating materials ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer pipe which carries sewage from a building for immediate disposal is Lateral sewer Main sewer Intercepting sewer House sewer Lateral sewer Main sewer Intercepting sewer House sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for Unexpected large scale infiltration of stream water Under estimates of maximum and average flows All of these Unexpected increase in the population Unexpected large scale infiltration of stream water Under estimates of maximum and average flows All of these Unexpected increase in the population ANSWER DOWNLOAD EXAMIANS APP