Waste Water Engineering The ratio of the diameter of a circular section and the side of a square section hydraulically equivalent, is 1.065 1.095 1.085 1.075 1.065 1.095 1.085 1.075 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For trunk and out-fall, the type of sewers generally used, is Circular shaped Horse shoe shaped Parabolic shaped Standard egg shaped Circular shaped Horse shoe shaped Parabolic shaped Standard egg shaped ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In case of Imhoff tanks, All of these Detention period is 2 hours The shape is rectangular The velocity of flow is restricted to 0.30 m/minute All of these Detention period is 2 hours The shape is rectangular The velocity of flow is restricted to 0.30 m/minute ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is 1 hour 2 hours 1 hour and 30 minutes 30 minutes 1 hour 2 hours 1 hour and 30 minutes 30 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Design period of 40 to 50 years is adopted for Main sewers Trunk sewers All listed here Branch sewers Main sewers Trunk sewers All listed here Branch sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The first stage of neutral process of sludge digestion, is Acid regression Alkaline fermentation None of these Acid fermentation Acid regression Alkaline fermentation None of these Acid fermentation ANSWER DOWNLOAD EXAMIANS APP