Waste Water Engineering The small sewers are cleaned by None of these Cane rodding Wooden pills Flushing None of these Cane rodding Wooden pills Flushing ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Chlorination of water is done for the removal of Suspended solids Sediments Bacterias Hardness Suspended solids Sediments Bacterias Hardness ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering ‘Cowl’ is provided at Upper end of the manhole First step in manhole Lower end of ventilating column Upper end of ventilating column Upper end of the manhole First step in manhole Lower end of ventilating column Upper end of ventilating column ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, Organic and inorganic materials are separated Detention period is kept 3 to 4 minutes Flow velocity is kept 0.09 m/sec All listed here Organic and inorganic materials are separated Detention period is kept 3 to 4 minutes Flow velocity is kept 0.09 m/sec All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 4 to 8 hours 8 to 16 hours 16 to 24 hours 24 to 36 hours 4 to 8 hours 8 to 16 hours 16 to 24 hours 24 to 36 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If q is the average sewage flow from a city of population P, the maximum sewage flow Q = [(18 + P)/(4 + )] q Q = [(18 + )/(4 + )] q Q = [(5 + )/((15 + )] q Q = [(4 + )/(18 + )] q Q = [(18 + P)/(4 + )] q Q = [(18 + )/(4 + )] q Q = [(5 + )/((15 + )] q Q = [(4 + )/(18 + )] q ANSWER DOWNLOAD EXAMIANS APP