Waste Water Engineering The small sewers are cleaned by None of these Cane rodding Flushing Wooden pills None of these Cane rodding Flushing Wooden pills ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer manholes are generally provided at The change of direction The junctions of sewers The change of gradient All of these The change of direction The junctions of sewers The change of gradient All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for Under estimates of maximum and average flows Unexpected large scale infiltration of stream water Unexpected increase in the population All of these Under estimates of maximum and average flows Unexpected large scale infiltration of stream water Unexpected increase in the population All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewage treatment in septic tanks is due to Anaerobic decomposition Aerobic decomposition None of these Parasitic decomposition Anaerobic decomposition Aerobic decomposition None of these Parasitic decomposition ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The first stage of neutral process of sludge digestion, is None of these Alkaline fermentation Acid regression Acid fermentation None of these Alkaline fermentation Acid regression Acid fermentation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The asbestos cement pipes are generally laid At an angle of 60° Horizontally At an angle of 30° Vertically At an angle of 60° Horizontally At an angle of 30° Vertically ANSWER DOWNLOAD EXAMIANS APP