Waste Water Engineering The suitable cross-section of sewers to carry combined flow, is Horse shoe shaped Circular Rectangular Egg shaped Horse shoe shaped Circular Rectangular Egg shaped ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of 100 cm 140 cm 160 cm 120 cm 100 cm 140 cm 160 cm 120 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Disposal to sewage in large cities, is done in Dilution Irrigation Oxidation Purification Dilution Irrigation Oxidation Purification ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The small sewers are cleaned by Flushing Wooden pills Cane rodding None of these Flushing Wooden pills Cane rodding None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Acid regression stage of sludge digestion at a temperature 21°C extends over a period of 60 days 15 days 30 days 90 days 60 days 15 days 30 days 90 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The bottom of the sewage inlet chamber of septic tanks, is provided an outward slope 1 in 20 1 in 10 1 in 5 1 in 15 1 in 20 1 in 10 1 in 5 1 in 15 ANSWER DOWNLOAD EXAMIANS APP