Waste Water Engineering For detecting the nitrites in the sewage, the matching colour may be developed by adding None of these Potassium permanganate Phenol-di -sulphuric acid potassium hydroxide Sulphuric acid and napthamine None of these Potassium permanganate Phenol-di -sulphuric acid potassium hydroxide Sulphuric acid and napthamine ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For providing an Indian type W.C., the R.C.C. slabs in the toilet portion Should be sunk by 20 cm Should be kept 20 cm above the adjacent portion Need not be sunk Should be sunk by 50 cm Should be sunk by 20 cm Should be kept 20 cm above the adjacent portion Need not be sunk Should be sunk by 50 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For sewer mains of 0.5 to 1 m diameter, the ratio of maximum daily sewage flow to the average daily sewage flow is assumed 2 2.5 1.5 3 2 2.5 1.5 3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Aerobic activity is maximum In freshly produced sewage In sewer treatment plants At sewer pipes None of these In freshly produced sewage In sewer treatment plants At sewer pipes None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering It is customary to design a sewer for D.W.F. on the basis of Four times the average demand Twice the average demand Average demand Thrice the average demand Four times the average demand Twice the average demand Average demand Thrice the average demand ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which received discharge from two or more main sewers, is known as An outfall sewer A main sewer A trunk sewer An intercepting sewer An outfall sewer A main sewer A trunk sewer An intercepting sewer ANSWER DOWNLOAD EXAMIANS APP