Waste Water Engineering If the diameter of a sewer is 100 mm, the gradient required for generating self cleansing velocity is None of these 1 in 100 1 in 120 1 in 60 None of these 1 in 100 1 in 120 1 in 60 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During preliminary treatment of a sewage Floating materials are removed by screening All listed here Oil and grease are removed from skimming tanks Girt and sand are removed by girt chambers Floating materials are removed by screening All listed here Oil and grease are removed from skimming tanks Girt and sand are removed by girt chambers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The rate of accumulation of sludge in septic tanks is recommended as 30 litres/person/year 30 litres/person/month 25 litres/person/month 25 litres/person/year 30 litres/person/year 30 litres/person/month 25 litres/person/month 25 litres/person/year ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Drop manholes at the junctions of sewer lines, are provided if Invert level of a branch sewer is more than 60 cm that of the main sewer Ordinary manhole cannot be built Two sewer lines intersect Sewer line runs along a main road Invert level of a branch sewer is more than 60 cm that of the main sewer Ordinary manhole cannot be built Two sewer lines intersect Sewer line runs along a main road ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering pH value of sludge during alkaline regression stage, is More than 7 Less than 6 More than 6 Less than 7 More than 7 Less than 6 More than 6 Less than 7 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated Flow velocity is kept 0.09 m/sec All listed here Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated Flow velocity is kept 0.09 m/sec All listed here ANSWER DOWNLOAD EXAMIANS APP