Waste Water Engineering In a sludge digestion tank if the moisture content of sludge V1 litres is reduced from p1 % to p2 % the volume V2 is [(100 + P1)/(100 – P2)] V1 [(100 – P1)/(100 – P2)] V1 [(100 – P1)/(100 + P2)] V1 [(100 + P2)/(100 – P1)] V1 [(100 + P1)/(100 – P2)] V1 [(100 – P1)/(100 – P2)] V1 [(100 – P1)/(100 + P2)] V1 [(100 + P2)/(100 – P1)] V1 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Boussinesq’s equation for ascertaining unit pressure at a depth on sewers due to traffic loads, is pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Antisyphonage pipe is fitted At the end of septic tanks With a W.'trap At the beginning of sewer line On manholes At the end of septic tanks With a W.'trap At the beginning of sewer line On manholes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of design discharge to the surface area of a sedimentation tank is called Overflow rate Surface loading Overflow velocity All of these Overflow rate Surface loading Overflow velocity All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The coagulant which is generally not used for treating the sewage, is Chlorinated coppers Ferric sulphate Alum Ferric chloride Chlorinated coppers Ferric sulphate Alum Ferric chloride ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In the activated sludge process Water is removed by centrifugal action Aeration is done with an admixture of previously aerated sludge Sludge is activated by constant stirring Aeration is continued till stability Water is removed by centrifugal action Aeration is done with an admixture of previously aerated sludge Sludge is activated by constant stirring Aeration is continued till stability ANSWER DOWNLOAD EXAMIANS APP