Waste Water Engineering Ventilating shafts are provided to a sewer line at every 300 m 150 m 100 m 200 m 300 m 150 m 100 m 200 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The pH value of sewage is determined with the help of None of these Turbid meter Imhoff Cone Potentiometer None of these Turbid meter Imhoff Cone Potentiometer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Nitrogen cycle of sewage, is Liberation of nitrogen-formation of nitrates-formation of nitrites-liberation of ammonia Formation of nitrates-formation of nitrites-liberation of nitrates-liberation of nitrates Liberation of nitrogen-liberation of ammonia-formation of nitrites- formation of nitrates Liberation of ammonia-formation of nitrites-formation of nitrates-liberation of nitrogen Liberation of nitrogen-formation of nitrates-formation of nitrites-liberation of ammonia Formation of nitrates-formation of nitrites-liberation of nitrates-liberation of nitrates Liberation of nitrogen-liberation of ammonia-formation of nitrites- formation of nitrates Liberation of ammonia-formation of nitrites-formation of nitrates-liberation of nitrogen ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sludge does not contain waste water from Kitchen sinks Toilets Wash basins Bath rooms Kitchen sinks Toilets Wash basins Bath rooms ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Pick up the incorrect statement from the following for allowing workers to enter sewers Proper tests for the presence of poisonous gases must be carried out The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes Warning signals should be erected The men entering the manhole should be advised to smoke in the sewer Proper tests for the presence of poisonous gases must be carried out The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes Warning signals should be erected The men entering the manhole should be advised to smoke in the sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering It is customary to design a sewer for D.W.F. on the basis of Average demand Twice the average demand Four times the average demand Thrice the average demand Average demand Twice the average demand Four times the average demand Thrice the average demand ANSWER DOWNLOAD EXAMIANS APP