Waste Water Engineering The spacing of man holes along a straight portion of a sewer is 300 m, the diameter of the sewer may be 1.2 m 1.5 m > 1.5 m 0.9 cm 1.2 m 1.5 m > 1.5 m 0.9 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is 100 cm 80 cm 90 cm 50 cm 100 cm 80 cm 90 cm 50 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Kjeldahl nitrogen is a mixture of Ammonia and nitrogen Organic nitrogen and ammonia Nitrogen and organic nitrogen All listed here Ammonia and nitrogen Organic nitrogen and ammonia Nitrogen and organic nitrogen All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In case of sewer lines Obstruction test is carried out with the help of smooth ball of diameter 13 mm Water test is carried out to check water tightness of the joints Test for straightness is carried out with the help of a lamp and mirror All listed here Obstruction test is carried out with the help of smooth ball of diameter 13 mm Water test is carried out to check water tightness of the joints Test for straightness is carried out with the help of a lamp and mirror All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a peak discharge of 0.0157 cumec, with a velocity of 0.9 m/sec, the diameter of the sewer main, is 10 cm 18 cm 15 cm 12 cm 10 cm 18 cm 15 cm 12 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the over land flow from the critical point to the drain is 8 km and the difference in level is 12.4 m, the inlet time is 5 hours 3 hours 2 hours 4 hours 5 hours 3 hours 2 hours 4 hours ANSWER DOWNLOAD EXAMIANS APP