Waste Water Engineering The spacing of man holes along a straight portion of a sewer is 300 m, the diameter of the sewer may be 0.9 cm 1.5 m > 1.5 m 1.2 m 0.9 cm 1.5 m > 1.5 m 1.2 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bio-chemical oxygen demand (BOD) for the first 20 days in generally referred to All of these First stage demand Carbonaceous demand Initial demand All of these First stage demand Carbonaceous demand Initial demand ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The use of coarse screens for the disposal of sewage, may be dispensed with by Shredder Comminutor Neither A nor B Both A and B Shredder Comminutor Neither A nor B Both A and B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For non-scouring velocity 5 m/sec, the type of sewers generally preferred to, is Cast iron sewers Cement concrete sewers Stone ware sewers Glazed bricks sewers Cast iron sewers Cement concrete sewers Stone ware sewers Glazed bricks sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The amount of oxygen consumed by the aerobic bacterias which cause the aerobic biological decomposition of sewage, is known None of these Bio-Chemical Oxygen Demand (B.O.D.) Chemical Oxygen Demand (C.O.D.) Dissolved Oxygen (D.O.) None of these Bio-Chemical Oxygen Demand (B.O.D.) Chemical Oxygen Demand (C.O.D.) Dissolved Oxygen (D.O.) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which transports the sewage to the point of treatment, is called Out-fall sewer Branch sewer Main sewer House sewer Out-fall sewer Branch sewer Main sewer House sewer ANSWER DOWNLOAD EXAMIANS APP