Waste Water Engineering The porosity of sediments in sewer pipes, is usually taken as 0.011 0.012 0.013 0.01 0.011 0.012 0.013 0.01 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The digested sludge from septic tanks, is removed after a maximum period of 3 years 5 years 3.5 years 4 years 3 years 5 years 3.5 years 4 years ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settlement of a particle in sedimentation tank, is affected by Velocity of flow Viscosity of water Size and shape of solid All listed here Velocity of flow Viscosity of water Size and shape of solid All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In trickling filter, B.O.D. is reduced to 30 to 40% 80 to 90% 60 to 80% 40 to 60% 30 to 40% 80 to 90% 60 to 80% 40 to 60% ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum depth of sedimentation tanks, is kept 4.5 m 3 m 4 m 3.5 m 4.5 m 3 m 4 m 3.5 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the diameter of a sewer is 100 mm, the gradient required for generating self cleansing velocity is None of these 1 in 100 1 in 60 1 in 120 None of these 1 in 100 1 in 60 1 in 120 ANSWER DOWNLOAD EXAMIANS APP