Waste Water Engineering The quantity of liquid waste which flows in sewers during the period of rainfall, is known Sanitary sewage Industrial waste Storm sewage None of these Sanitary sewage Industrial waste Storm sewage None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering When drainage to sewage ratio is 20, the peak dry weather flow is Slightly more than 5% of the design discharge None of these Slightly less than 5% of the design discharge 20% of the design discharge Slightly more than 5% of the design discharge None of these Slightly less than 5% of the design discharge 20% of the design discharge ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering ‘Cowl’ is provided at Lower end of ventilating column First step in manhole Upper end of the manhole Upper end of ventilating column Lower end of ventilating column First step in manhole Upper end of the manhole Upper end of ventilating column ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bottom openings 15 cm × 15 cm in the standing baffle wall are provided 15 cm c/c 30 cm c/c 22.5 cm c/c 50 cm c/c 15 cm c/c 30 cm c/c 22.5 cm c/c 50 cm c/c ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 3.0 ml of raw sewage is diluted to 300 ml. The D.O. concentration of the diluted sample at the beginning of the test was 8 mg/l. After 5 day-incubation at 20°C, the D.O. concentration was 5 mg/l. The BOD of raw sewerage is 200 mg/l 300 mg/l 400 mg/l 100 mg/l 200 mg/l 300 mg/l 400 mg/l 100 mg/l ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In areas where rainy season is limited to a few months, the type of sewerage system recommended is Partially separate system Combined system None of these Separate system Partially separate system Combined system None of these Separate system ANSWER DOWNLOAD EXAMIANS APP