Waste Water Engineering If the length of overland flow from the critical point to the mouth of drain is 13.58 km and difference in level between the critical point and drain mouth is 10 m, the inlet time is 8 hours 6 hours 2 hours 4 hours 8 hours 6 hours 2 hours 4 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The self-cleansing velocity of water flowing through pipe lines, is 0.5 metre/sec 2 metres/sec 0.25 metre/sec 1 metre/sec 0.5 metre/sec 2 metres/sec 0.25 metre/sec 1 metre/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering To prevent settling down of sewage both at the bottom and on the sides of a large sewer, self-cleaning velocity recommended for Indian conditions, is 0.75 m/sec 0.70 m/sec 0.60 m/sec 0.50 m/sec 0.75 m/sec 0.70 m/sec 0.60 m/sec 0.50 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The minimum diameter of a sewer is kept 15 cm 20 cm 25 cm 10 cm 15 cm 20 cm 25 cm 10 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 1000 kg of sewage contains Both A and C of above 0.112 kg in solution 0.225 kg in solution 0.112 kg in suspension Both A and C of above 0.112 kg in solution 0.225 kg in solution 0.112 kg in suspension ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The minimum recommended diameter of sewers, is 10 cm 5 cm 15 cm 20 cm 10 cm 5 cm 15 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP