Waste Water Engineering The most dangerous pollutant in vehicular emissions is O₂ SO₂ CO₂ CO₂ O₂ SO₂ CO₂ CO₂ ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 7 days 12 days 14 days 2 days 7 days 12 days 14 days 2 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dry water flow in a combined sewer, is Domestic sewage Industrial sewage Inclusive of domestic and industrial sewage but excludes storm water Storm water Domestic sewage Industrial sewage Inclusive of domestic and industrial sewage but excludes storm water Storm water ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 5 days-biochemical oxygen demand (BOD5) is taken at a temperature of 0°C 25°C 20°C 15°C 0°C 25°C 20°C 15°C ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A cylindrical ejector having its height 2 m fills after every 10 minutes with a peak sewage discharge of 0.0157 cumec. The diameter of the ejector chamber, is 2.50 m 2.40 m 2.30 m 2.45 m 2.50 m 2.40 m 2.30 m 2.45 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In case of Imhoff tanks, The velocity of flow is restricted to 0.30 m/minute Detention period is 2 hours All of these The shape is rectangular The velocity of flow is restricted to 0.30 m/minute Detention period is 2 hours All of these The shape is rectangular ANSWER DOWNLOAD EXAMIANS APP