Waste Water Engineering Are available in size Stoneware sewers 20 cm All of these 10 cm 15 cm 20 cm All of these 10 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most widely used pump for lifting sewage is Pneumatic ejector Centrifugal pump Reciprocating pump Air pressure pump Pneumatic ejector Centrifugal pump Reciprocating pump Air pressure pump ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 1 5 to 10 3 to 5 2 to 3 1 5 to 10 3 to 5 2 to 3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Acid regression stage of sludge digestion at a temperature 21°C extends over a period of 15 days 90 days 60 days 30 days 15 days 90 days 60 days 30 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During preliminary treatment of a sewage Floating materials are removed by screening All listed here Girt and sand are removed by girt chambers Oil and grease are removed from skimming tanks Floating materials are removed by screening All listed here Girt and sand are removed by girt chambers Oil and grease are removed from skimming tanks ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settlement velocity of a solid (diameter 0.5 mm, specific gravity 1.75) in water having temperature 10°C, is 313.5 cm/sec 500 cm/sec 413.5 cm/sec 213.5 cm/sec 313.5 cm/sec 500 cm/sec 413.5 cm/sec 213.5 cm/sec ANSWER DOWNLOAD EXAMIANS APP