Waste Water Engineering The sewer pipes All listed here Are designed for generating self-cleansing velocities at different discharge Carry sewage as gravity conduits Should resist the wear and tear caused due to abrasion All listed here Are designed for generating self-cleansing velocities at different discharge Carry sewage as gravity conduits Should resist the wear and tear caused due to abrasion ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In 1000 kg of sewage, the total solids approximate 7.5 kg to 10 kg 5 kg to 7.5 kg 1 kg to 2.0 kg 0.5 to 1.0 kg 7.5 kg to 10 kg 5 kg to 7.5 kg 1 kg to 2.0 kg 0.5 to 1.0 kg ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Pick up the incorrect statement from the following for allowing workers to enter sewers Proper tests for the presence of poisonous gases must be carried out The men entering the manhole should be advised to smoke in the sewer Warning signals should be erected The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes Proper tests for the presence of poisonous gases must be carried out The men entering the manhole should be advised to smoke in the sewer Warning signals should be erected The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of 120 cm 140 cm 100 cm 160 cm 120 cm 140 cm 100 cm 160 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In the activated sludge process Aeration is continued till stability Water is removed by centrifugal action Sludge is activated by constant stirring Aeration is done with an admixture of previously aerated sludge Aeration is continued till stability Water is removed by centrifugal action Sludge is activated by constant stirring Aeration is done with an admixture of previously aerated sludge ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If is the diameter of upper circular portion, the overall depth of New Egg shaped sewer section, is 1.425 D 1.350 D 1.625 D 1.250 D 1.425 D 1.350 D 1.625 D 1.250 D ANSWER DOWNLOAD EXAMIANS APP