Waste Water Engineering For estimating the peak run off the rational formula Q = 0.0278 KpA was evolved by Lloyd Davis All listed here Kinchling Frubling Lloyd Davis All listed here Kinchling Frubling ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a sedimentation tank (length L, width B, depth D) the settling velocity of a particle for a discharge Q, is Q/L Q/(L × D) Q/(B × D) Q/(B × L) Q/L Q/(L × D) Q/(B × D) Q/(B × L) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which resists sulphide corrosion, is Cast iron sewer R.C. sewer Brick sewer Lead sewer Cast iron sewer R.C. sewer Brick sewer Lead sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dried sewage after treatment is used as Fertilizer Base material for paints Chemical for lowering B.O.D. Building material Fertilizer Base material for paints Chemical for lowering B.O.D. Building material ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The presence of free ammonia in sewage, is detected by Adding potassium permanganate Adding sulphuric acid Phenol-di-sulphuric acid Boiling Adding potassium permanganate Adding sulphuric acid Phenol-di-sulphuric acid Boiling ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is 5 m 5.5 m 7 m 6.5 m 5 m 5.5 m 7 m 6.5 m ANSWER DOWNLOAD EXAMIANS APP