Waste Water Engineering To maintain aerobic biological activity, the moisture content of the compost mass should be about 0.5 0.6 0.45 0.55 0.5 0.6 0.45 0.55 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the depletion of oxygen is found to be 5 ppm after incubating a 2.5% solution of sewage sample for 5 days at 21°C, B.O.D. of the sewage is 50 ppm 150 ppm 100 ppm 200 ppm 50 ppm 150 ppm 100 ppm 200 ppm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The minimum diameter of sewer to be adopted is 12.5 cm 25 cm 10 cm 15 cm 12.5 cm 25 cm 10 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The bottom of the sewage inlet chamber of septic tanks, is provided an outward slope 1 in 20 1 in 5 1 in 15 1 in 10 1 in 20 1 in 5 1 in 15 1 in 10 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a sludge digestion tank if the moisture content of sludge V1 litres is reduced from p1 % to p2 % the volume V2 is [(100 – P1)/(100 – P2)] V1 [(100 – P1)/(100 + P2)] V1 [(100 + P1)/(100 – P2)] V1 [(100 + P2)/(100 – P1)] V1 [(100 – P1)/(100 – P2)] V1 [(100 – P1)/(100 + P2)] V1 [(100 + P1)/(100 – P2)] V1 [(100 + P2)/(100 – P1)] V1 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The reduced levels of the string at the consecutive sight rails A and B are 203.575 m, 203.475 m respectively. If the difference of their R.D.s is 10 m, the gradient of the sewer line is 1 in 100 downward 1 in 500 upward 1 in 100 upward 1 in 503 upward 1 in 100 downward 1 in 500 upward 1 in 100 upward 1 in 503 upward ANSWER DOWNLOAD EXAMIANS APP