Waste Water Engineering To maintain aerobic biological activity, the moisture content of the compost mass should be about 0.6 0.55 0.45 0.5 0.6 0.55 0.45 0.5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering With self cleansing velocity in sewers Neither silting nor scouring occurs at bottom Silting occurs at bottom Scouring occurs at bottom Both silting and scouring occur at bottom Neither silting nor scouring occurs at bottom Silting occurs at bottom Scouring occurs at bottom Both silting and scouring occur at bottom ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most efficient cross section of sewers in a separate sewerage system is Parabolic Circular New egged Rectangular Parabolic Circular New egged Rectangular ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering No treatment of the sewage is given if dilution factor is Between 150 to 200 Less than 150 Between 200 to 300 More than 500 Between 150 to 200 Less than 150 Between 200 to 300 More than 500 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is 80 cm 100 cm 90 cm 50 cm 80 cm 100 cm 90 cm 50 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 4 to 8 hours 8 to 16 hours 16 to 24 hours 24 to 36 hours 4 to 8 hours 8 to 16 hours 16 to 24 hours 24 to 36 hours ANSWER DOWNLOAD EXAMIANS APP