Waste Water Engineering To maintain aerobic biological activity, the moisture content of the compost mass should be about 0.45 0.5 0.55 0.6 0.45 0.5 0.55 0.6 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Ventilating shafts are provided to a sewer line at every 200 m 300 m 150 m 100 m 200 m 300 m 150 m 100 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For large sewers, maximum distance between manholes may be 200 m 300 m 100 m 50 m 200 m 300 m 100 m 50 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering depends upon The Chezy’s constant C in the formula V = C Size of the sewer Roughness of sewer surface Shape of the sewer All listed here Size of the sewer Roughness of sewer surface Shape of the sewer All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In olden days the type of section adopted in trunk and out fall sewers was Egg shaped Circular shaped Parabolic shaped Horse shoe shaped Egg shaped Circular shaped Parabolic shaped Horse shoe shaped ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For providing an Indian type W.C., the R.C.C. slabs in the toilet portion Need not be sunk Should be sunk by 50 cm Should be kept 20 cm above the adjacent portion Should be sunk by 20 cm Need not be sunk Should be sunk by 50 cm Should be kept 20 cm above the adjacent portion Should be sunk by 20 cm ANSWER DOWNLOAD EXAMIANS APP