Waste Water Engineering In a fully mechanised composting plant, involves Mechanized receipt Mechanized segregation Mechanized pulverising of refuse All of these Mechanized receipt Mechanized segregation Mechanized pulverising of refuse All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewers the gas generally found, is Methane (CH4) Carbon dioxide (CO2) All listed here Hydrogen sulphide (H2S) Methane (CH4) Carbon dioxide (CO2) All listed here Hydrogen sulphide (H2S) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is 2 hours 1 hour 30 minutes 1 hour and 30 minutes 2 hours 1 hour 30 minutes 1 hour and 30 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 4 to 8 hours 8 to 16 hours 24 to 36 hours 16 to 24 hours 4 to 8 hours 8 to 16 hours 24 to 36 hours 16 to 24 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During purification process of sewage the gas given off, is Carbon dioxide Ammonia Hydrogen All listed here Carbon dioxide Ammonia Hydrogen All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Removal of oil and grease from sewage, is known Screening Skimming None of these Filtration Screening Skimming None of these Filtration ANSWER DOWNLOAD EXAMIANS APP