Waste Water Engineering In a fully mechanised composting plant, involves All of these Mechanized receipt Mechanized segregation Mechanized pulverising of refuse All of these Mechanized receipt Mechanized segregation Mechanized pulverising of refuse ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum spacing of manholes specified by Indian standard in sewers upto 0.3 m diameter is 30 m 20 m 45 m 75 m 30 m 20 m 45 m 75 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The screens are fixed Parallel to the direction of flow None of these At an angle 30° to 60° to the direction of flow Perpendicular to the direction of flow Parallel to the direction of flow None of these At an angle 30° to 60° to the direction of flow Perpendicular to the direction of flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Drop manholes at the junctions of sewer lines, are provided if Sewer line runs along a main road Invert level of a branch sewer is more than 60 cm that of the main sewer Ordinary manhole cannot be built Two sewer lines intersect Sewer line runs along a main road Invert level of a branch sewer is more than 60 cm that of the main sewer Ordinary manhole cannot be built Two sewer lines intersect ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In primary sedimentation, the 0.2 mm inorganic solids get separated if specific gravity is 2.25 2.55 2.5 2.65 2.25 2.55 2.5 2.65 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The width of a rectangular sewer is twice its depth while discharging 1.5 m/sec. The width of the sewer is 1.36 m 0.88 m 1.76 m 0.68 m 1.36 m 0.88 m 1.76 m 0.68 m ANSWER DOWNLOAD EXAMIANS APP