Waste Water Engineering In a fully mechanised composting plant, involves All of these Mechanized receipt Mechanized segregation Mechanized pulverising of refuse All of these Mechanized receipt Mechanized segregation Mechanized pulverising of refuse ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Setting out the alignments of sewers may start from Out-fall Any point Tail end City Out-fall Any point Tail end City ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of bars of perforations of fine screens used for the treatment of sewage, is 3 to 5 mm 2 to 3 mm 5 to 8 mm 8 to 10 mm 3 to 5 mm 2 to 3 mm 5 to 8 mm 8 to 10 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most effective arrangement for diverting excess storm water into a natural drainage, is Leaping weir Overflow weir None of these Siphon spill way Leaping weir Overflow weir None of these Siphon spill way ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The liquid wastes from kitchens, bath rooms and wash basins, is not called Sewage None of these Sullage Liquid waste Sewage None of these Sullage Liquid waste ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of 120 cm 160 cm 100 cm 140 cm 120 cm 160 cm 100 cm 140 cm ANSWER DOWNLOAD EXAMIANS APP