Waste Water Engineering The sewerage system originates from Main sewers House sewers Branch sewers Lateral sewers Main sewers House sewers Branch sewers Lateral sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering When drainage to sewage ratio is 20, the peak dry weather flow is 20% of the design discharge Slightly less than 5% of the design discharge None of these Slightly more than 5% of the design discharge 20% of the design discharge Slightly less than 5% of the design discharge None of these Slightly more than 5% of the design discharge ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 16 to 24 hours 4 to 8 hours 24 to 36 hours 8 to 16 hours 16 to 24 hours 4 to 8 hours 24 to 36 hours 8 to 16 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The small sewers are cleaned by Wooden pills Cane rodding None of these Flushing Wooden pills Cane rodding None of these Flushing ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the over land flow from the critical point to the drain is 8 km and the difference in level is 12.4 m, the inlet time is 3 hours 5 hours 4 hours 2 hours 3 hours 5 hours 4 hours 2 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which one of the following resists hydrogen sulphide corrosion? Asbestos cement Glazed ware Glazed stone wares R.C.C. Asbestos cement Glazed ware Glazed stone wares R.C.C. ANSWER DOWNLOAD EXAMIANS APP