Waste Water Engineering
The sewers

Must flow under gravity ½ to ¾ full
Must be of adequate size to avoid over flow
All listed here
Must be laid at least 2 to 3 m deep to collect /water from the basements

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The pressure exerted by

All listed here
The internal pressure if any, causes tensile stress in the pipe material
The sewage when running full from inside, is called internal pressure
Pressure sewers are designed to be safe in tension

ANSWER DOWNLOAD EXAMIANS APP