Waste Water Engineering The sewerage system originates from Main sewers House sewers Lateral sewers Branch sewers Main sewers House sewers Lateral sewers Branch sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a fully mechanised composting plant, involves Mechanized pulverising of refuse Mechanized receipt Mechanized segregation All of these Mechanized pulverising of refuse Mechanized receipt Mechanized segregation All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For house drainage minimum gradient is 1 in 400 1 in 10 1 in 80 1 in 60 1 in 400 1 in 10 1 in 80 1 in 60 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewers the velocity of flow should not be More than the self-cleansing velocity Less than 10 m/sec Less than the self-cleansing velocity More than 20 m/sec More than the self-cleansing velocity Less than 10 m/sec Less than the self-cleansing velocity More than 20 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The rate of accumulation of sludge per person per year, is 15 litres 10 litres 25 litres 20 litres 15 litres 10 litres 25 litres 20 litres ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The effluent of a septic tank is None of these Fit for discharge into any open drain As good as that from a complete treatment Foul and contains dissolved and suspended solids None of these Fit for discharge into any open drain As good as that from a complete treatment Foul and contains dissolved and suspended solids ANSWER DOWNLOAD EXAMIANS APP