Waste Water Engineering The sewerage system originates from Lateral sewers House sewers Branch sewers Main sewers Lateral sewers House sewers Branch sewers Main sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A cylindrical ejector having its height 2 m fills after every 10 minutes with a peak sewage discharge of 0.0157 cumec. The diameter of the ejector chamber, is 2.50 m 2.40 m 2.30 m 2.45 m 2.50 m 2.40 m 2.30 m 2.45 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The flow velocity in detritus tanks is 1.25 m/sec None of these 0.05 m/sec 0.09 m/sec 1.25 m/sec None of these 0.05 m/sec 0.09 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If a 2% solution of sewage sample is incubated for 5 days at 20°C and the dissolved oxygen depletion was found to be 8 mg/l. The BOD of the sewage is 400 mg/l 200 mg/l 100 mg/l 300 mg/l 400 mg/l 200 mg/l 100 mg/l 300 mg/l ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Rate of flow of sewage is generally assumed At 150 litres per capita More than the rate of water supply Less than the rate of water supply Equal to the rate of water supply At 150 litres per capita More than the rate of water supply Less than the rate of water supply Equal to the rate of water supply ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The small sewers are cleaned by Flushing Wooden pills Cane rodding None of these Flushing Wooden pills Cane rodding None of these ANSWER DOWNLOAD EXAMIANS APP