Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 7 days 12 days 14 days 2 days 7 days 12 days 14 days 2 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of maximum sewage flow to average sewage flow for mains up to 1 m in diameter, is 4 1.5 2 3 4 1.5 2 3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a grit chamber of a sewage treatment plant, Flow velocity 0.15 m to 0.3 m/sec is kept Depth of 0.9 m to 1.20 m is kept All of these One minute of detention period is kept Flow velocity 0.15 m to 0.3 m/sec is kept Depth of 0.9 m to 1.20 m is kept All of these One minute of detention period is kept ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the grit in grit chambers is 4.5 million litres per day, its cleaning is done Mechanically Hydraulically Electrically Manually Mechanically Hydraulically Electrically Manually ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The gradient of sewers depends upon Discharge Velocity of flow All listed here Diameter of the sewer Discharge Velocity of flow All listed here Diameter of the sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering hydraulically equivalent, the relationship which holds good, is D8/3 = 4 b8/3 D3/8 = 4 b3/8 D3/2 = 4 b3/2 D2/3 = 4 b2/3 D8/3 = 4 b8/3 D3/8 = 4 b3/8 D3/2 = 4 b3/2 D2/3 = 4 b2/3 ANSWER DOWNLOAD EXAMIANS APP