Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 7 days 14 days 12 days 2 days 7 days 14 days 12 days 2 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Setting out the alignments of sewers may start from City Out-fall Tail end Any point City Out-fall Tail end Any point ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The use of coarse screens for the disposal of sewage, may be dispensed with by Shredder Comminutor Both A and B Neither A nor B Shredder Comminutor Both A and B Neither A nor B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The drainage area of a town is 12 hectares. Its 40% area is hard pavement ( K = 0.85), the 40% area is unpaved streets (K = 0.20) and the remaining is wooded areas (K = 0.15). Assuming the time of concentration for the areas as 30 minutes and using the formula Ps = 900/(t + 60) the maximum run off is 0.10 cumec 0.12 cumec 0.15 cumec 0.20 cumec 0.10 cumec 0.12 cumec 0.15 cumec 0.20 cumec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Ventilating shafts are provided to a sewer line at every 200 m 300 m 150 m 100 m 200 m 300 m 150 m 100 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The layers of vegetable wastes and night soil alternatively piled above the ground to form a mound, is called A heap Windrow Plateau None of these A heap Windrow Plateau None of these ANSWER DOWNLOAD EXAMIANS APP