Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 12 days 7 days 2 days 14 days 12 days 7 days 2 days 14 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The minimum recommended diameter of sewers, is 10 cm 15 cm 5 cm 20 cm 10 cm 15 cm 5 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The drop man holes are generally provided in sewers for Large town ships Hilly town ships Industrial areas Cities in plains Large town ships Hilly town ships Industrial areas Cities in plains ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sludge does not contain waste water from Bath rooms Toilets Wash basins Kitchen sinks Bath rooms Toilets Wash basins Kitchen sinks ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, Detention period is kept 3 to 4 minutes Flow velocity is kept 0.09 m/sec All listed here Organic and inorganic materials are separated Detention period is kept 3 to 4 minutes Flow velocity is kept 0.09 m/sec All listed here Organic and inorganic materials are separated ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Facultative bacteria survive in Neither A nor B The presence of oxygen The absence of oxygen Both cases A and B Neither A nor B The presence of oxygen The absence of oxygen Both cases A and B ANSWER DOWNLOAD EXAMIANS APP