Waste Water Engineering

Waste Water Engineering
The grit chambers of sewage treatment plants, are generally cleaned after

2 days
7 days
12 days
14 days

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The underground sewers are more subjected to

Bending force
Tensile force
Shearing force
Compressive force

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is

90 cm
100 cm
50 cm
80 cm

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
When drainage to sewage ratio is 20, the peak dry weather flow is

20% of the design discharge
None of these
Slightly less than 5% of the design discharge
Slightly more than 5% of the design discharge

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
A circular sewer section is preferred to because

It provides maximum area for a given perimeter
It provides maximum hydraulic mean depth
All listed here
It is cheaper in construction

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Ventilating shafts are provided to a sewer line at every

200 m
100 m
300 m
150 m

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Waste Water Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑