Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 14 days 12 days 7 days 2 days 14 days 12 days 7 days 2 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is d² (0.011d + 0.785H)/Q d (0.785d + 0.011H)/Q d (0.022d + 0.085H)/Q d (0.285d + 0.011H)/Q d² (0.011d + 0.785H)/Q d (0.785d + 0.011H)/Q d (0.022d + 0.085H)/Q d (0.285d + 0.011H)/Q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The asbestos cement pipes are generally laid Horizontally At an angle of 30° At an angle of 60° Vertically Horizontally At an angle of 30° At an angle of 60° Vertically ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The layers of vegetable wastes and night soil alternatively piled above the ground to form a mound, is called Windrow None of these A heap Plateau Windrow None of these A heap Plateau ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In SI units the power of sound is represented in Watts Kgs Newtons Joules Watts Kgs Newtons Joules ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 15 cumecs, the depth d and width are related by For drains up to B = 0.5 d B = 0.2 d d = 0.2 B d = 0.5 B B = 0.5 d B = 0.2 d d = 0.2 B d = 0.5 B ANSWER DOWNLOAD EXAMIANS APP