Waste Water Engineering Lead caulked joints are used for laying Earthenware pipes Stone ware pipes I. pipes G.I. pipes Earthenware pipes Stone ware pipes I. pipes G.I. pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The rational formula for peak drainage discharge, was evolved by Lloyd David All of these Fruhling Kuichling Lloyd David All of these Fruhling Kuichling ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is 50 cm 100 cm 90 cm 80 cm 50 cm 100 cm 90 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the flame of a miner's safety lamp in the upper layers of the sewer forms an explosive, the sewer certainly contains Hydrogen sulphide Carbon dioxide Oxygen Methane Hydrogen sulphide Carbon dioxide Oxygen Methane ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering With self cleansing velocity in sewers Scouring occurs at bottom Neither silting nor scouring occurs at bottom Both silting and scouring occur at bottom Silting occurs at bottom Scouring occurs at bottom Neither silting nor scouring occurs at bottom Both silting and scouring occur at bottom Silting occurs at bottom ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Cement concrete sewers are only suitable if non-scouring velocity is between 2.5 to 3.0 m/sec 3.0 to 4.0 m/sec 4.5 to 5.5 m/sec 3.5 to 4.5 m/sec 2.5 to 3.0 m/sec 3.0 to 4.0 m/sec 4.5 to 5.5 m/sec 3.5 to 4.5 m/sec ANSWER DOWNLOAD EXAMIANS APP