Waste Water Engineering If the depletion of oxygen is found to be 2.5 mg/litre after incubating 2.5 ml of sewage diluted to 250 ml for 5 days at 20°C, B.O.D. of the sewage is 50 mg/l 100 mg/l 150 mg/l 250 mg/l 50 mg/l 100 mg/l 150 mg/l 250 mg/l ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The digested sludge from septic tanks, is removed after a maximum period of 4 years 5 years 3.5 years 3 years 4 years 5 years 3.5 years 3 years ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The minimum diameter of sewer to be adopted is 10 cm 12.5 cm 15 cm 25 cm 10 cm 12.5 cm 15 cm 25 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The presence of free ammonia in sewage, is detected by Boiling Adding potassium permanganate Adding sulphuric acid Phenol-di-sulphuric acid Boiling Adding potassium permanganate Adding sulphuric acid Phenol-di-sulphuric acid ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bio-chemical oxygen demand (BOD) for the first 20 days in generally referred to Initial demand First stage demand All of these Carbonaceous demand Initial demand First stage demand All of these Carbonaceous demand ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If D is the diameter of a circular sewer and D’ is the top horizontal diameter of an equivalent egg shaped section, the relationship which holds good, is D’ = 0.64 D D’ = 0.74 D D’ = 0.84 D D’ = 0.94 D D’ = 0.64 D D’ = 0.74 D D’ = 0.84 D D’ = 0.94 D ANSWER DOWNLOAD EXAMIANS APP