Waste Water Engineering The sewer pipe which carries sewage from a building for immediate disposal is House sewer Intercepting sewer Lateral sewer Main sewer House sewer Intercepting sewer Lateral sewer Main sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is 5 m 5.5 m 6.5 m 7 m 5 m 5.5 m 6.5 m 7 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For providing an Indian type W.C., the R.C.C. slabs in the toilet portion Should be kept 20 cm above the adjacent portion Should be sunk by 20 cm Need not be sunk Should be sunk by 50 cm Should be kept 20 cm above the adjacent portion Should be sunk by 20 cm Need not be sunk Should be sunk by 50 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which transports the sewage to the point of treatment, is called Branch sewer Main sewer Out-fall sewer House sewer Branch sewer Main sewer Out-fall sewer House sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Traps Are used to trap the rats entering sewers Create symphonic action to increase the quick disposal of sewerage Are water seals which prevent the entry of foul gases Dissolve the foul gases Are used to trap the rats entering sewers Create symphonic action to increase the quick disposal of sewerage Are water seals which prevent the entry of foul gases Dissolve the foul gases ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In septic tanks, decomposition of organic bacteria, is done by None of these Aerobic bacteria Both types of bacterias Anaerobic bacteria None of these Aerobic bacteria Both types of bacterias Anaerobic bacteria ANSWER DOWNLOAD EXAMIANS APP