Waste Water Engineering The sewer pipe which carries sewage from a building for immediate disposal is House sewer Lateral sewer Main sewer Intercepting sewer House sewer Lateral sewer Main sewer Intercepting sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 16 to 24 hours 4 to 8 hours 8 to 16 hours 24 to 36 hours 16 to 24 hours 4 to 8 hours 8 to 16 hours 24 to 36 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In R.C. sewer pipes, the percentage longitudinal reinforcement to the cross-sectional area of concrete is kept 2 0.25 5 10 2 0.25 5 10 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For sewer mains of 0.5 to 1 m diameter, the ratio of maximum daily sewage flow to the average daily sewage flow is assumed 2.5 2 1.5 3 2.5 2 1.5 3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a grit chamber of a sewage treatment plant, All of these Flow velocity 0.15 m to 0.3 m/sec is kept One minute of detention period is kept Depth of 0.9 m to 1.20 m is kept All of these Flow velocity 0.15 m to 0.3 m/sec is kept One minute of detention period is kept Depth of 0.9 m to 1.20 m is kept ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Pick up the incorrect statement from the following for allowing workers to enter sewers The men entering the manhole should be advised to smoke in the sewer Warning signals should be erected Proper tests for the presence of poisonous gases must be carried out The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes The men entering the manhole should be advised to smoke in the sewer Warning signals should be erected Proper tests for the presence of poisonous gases must be carried out The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes ANSWER DOWNLOAD EXAMIANS APP