Waste Water Engineering The sewer pipe which carries sewage from a building for immediate disposal is Lateral sewer Main sewer Intercepting sewer House sewer Lateral sewer Main sewer Intercepting sewer House sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In septic tanks, The clear space between the baffle top and covering slab is about 7.5 cm Free board of 0.3 m may be provided All listed here The baffles or tees are extended up to top level of scum The clear space between the baffle top and covering slab is about 7.5 cm Free board of 0.3 m may be provided All listed here The baffles or tees are extended up to top level of scum ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 1 3 to 5 5 to 10 2 to 3 1 3 to 5 5 to 10 2 to 3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For large sewers, maximum distance between manholes may be 50 m 200 m 100 m 300 m 50 m 200 m 100 m 300 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of bars of perforations of fine screens used for the treatment of sewage, is 2 to 3 mm 3 to 5 mm 8 to 10 mm 5 to 8 mm 2 to 3 mm 3 to 5 mm 8 to 10 mm 5 to 8 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewerage system consists of House sewer All of these Branch sewer Lateral sewer House sewer All of these Branch sewer Lateral sewer ANSWER DOWNLOAD EXAMIANS APP