Waste Water Engineering The rate of accumulation of sludge per person per year, is 20 litres 15 litres 10 litres 25 litres 20 litres 15 litres 10 litres 25 litres ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The use of coarse screens for the disposal of sewage, may be dispensed with by Shredder Comminutor Neither A nor B Both A and B Shredder Comminutor Neither A nor B Both A and B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering To prevent settling down of sewage both at the bottom and on the sides of a large sewer, self-cleaning velocity recommended for Indian conditions, is 0.70 m/sec 0.75 m/sec 0.50 m/sec 0.60 m/sec 0.70 m/sec 0.75 m/sec 0.50 m/sec 0.60 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is 5 m 6.5 m 5.5 m 7 m 5 m 6.5 m 5.5 m 7 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The small sewers are cleaned by Wooden pills Cane rodding None of these Flushing Wooden pills Cane rodding None of these Flushing ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Drop manholes at the junctions of sewer lines, are provided if Sewer line runs along a main road Ordinary manhole cannot be built Two sewer lines intersect Invert level of a branch sewer is more than 60 cm that of the main sewer Sewer line runs along a main road Ordinary manhole cannot be built Two sewer lines intersect Invert level of a branch sewer is more than 60 cm that of the main sewer ANSWER DOWNLOAD EXAMIANS APP