Waste Water Engineering The digested sludge from septic tanks, is removed after a maximum period of 3.5 years 4 years 5 years 3 years 3.5 years 4 years 5 years 3 years ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Clogging of sewers, is caused due to Low discharge All of these Silting Greasy and oily matters Low discharge All of these Silting Greasy and oily matters ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the length of overland flow from the critical point to the mouth of drain is 13.58 km and difference in level between the critical point and drain mouth is 10 m, the inlet time is 6 hours 8 hours 2 hours 4 hours 6 hours 8 hours 2 hours 4 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer ventilating columns are generally placed at Every change in the size of sewers All listed here Upper ends of branch sewers Distances 150 m to 300 m Every change in the size of sewers All listed here Upper ends of branch sewers Distances 150 m to 300 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bio-chemical oxygen demand (BOD) for the first 20 days in generally referred to All of these First stage demand Initial demand Carbonaceous demand All of these First stage demand Initial demand Carbonaceous demand ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering When drainage to sewage ratio is 20, the peak dry weather flow is None of these 20% of the design discharge Slightly more than 5% of the design discharge Slightly less than 5% of the design discharge None of these 20% of the design discharge Slightly more than 5% of the design discharge Slightly less than 5% of the design discharge ANSWER DOWNLOAD EXAMIANS APP