Waste Water Engineering The digested sludge from septic tanks, is removed after a maximum period of 4 years 3 years 5 years 3.5 years 4 years 3 years 5 years 3.5 years ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is d (0.022d + 0.085H)/Q d (0.785d + 0.011H)/Q d (0.285d + 0.011H)/Q d² (0.011d + 0.785H)/Q d (0.022d + 0.085H)/Q d (0.785d + 0.011H)/Q d (0.285d + 0.011H)/Q d² (0.011d + 0.785H)/Q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is 5 m 5.5 m 7 m 6.5 m 5 m 5.5 m 7 m 6.5 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The disintegrating pump in which solid matter is broken up before passing out, is Reciprocating pump None of these Centrifugal pump Pneumatic ejector Reciprocating pump None of these Centrifugal pump Pneumatic ejector ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If is the diameter of upper circular portion, the overall depth of New Egg shaped sewer section, is 1.425 D 1.250 D 1.625 D 1.350 D 1.425 D 1.250 D 1.625 D 1.350 D ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The rate of accumulation of sludge in septic tanks is recommended as 25 litres/person/year 25 litres/person/month 30 litres/person/month 30 litres/person/year 25 litres/person/year 25 litres/person/month 30 litres/person/month 30 litres/person/year ANSWER DOWNLOAD EXAMIANS APP