Waste Water Engineering The digested sludge from septic tanks, is removed after a maximum period of 3.5 years 5 years 4 years 3 years 3.5 years 5 years 4 years 3 years ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The drop man holes are generally provided in sewers for Cities in plains Hilly town ships Large town ships Industrial areas Cities in plains Hilly town ships Large town ships Industrial areas ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A five day B.O.D. at 15°C of the sewage of a town is 100 kg/day. If the 5 day B.O.D. per head at 15°C for standard sewage is 0.1 kg/day, the population equivalent is 100 5000 10000 1000 100 5000 10000 1000 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer pipes need be checked for Both A and B Minimum flow None of these Maximum flow Both A and B Minimum flow None of these Maximum flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at Two third full Half full Full depth Three fourth full Two third full Half full Full depth Three fourth full ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The water carried sewerage system removes All listed here Storm sewage Industrial sewage Domestic sewage All listed here Storm sewage Industrial sewage Domestic sewage ANSWER DOWNLOAD EXAMIANS APP