Waste Water Engineering The sewers Must be laid at least 2 to 3 m deep to collect /water from the basements Must flow under gravity ½ to ¾ full Must be of adequate size to avoid over flow All listed here Must be laid at least 2 to 3 m deep to collect /water from the basements Must flow under gravity ½ to ¾ full Must be of adequate size to avoid over flow All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is 80 cm 90 cm 50 cm 100 cm 80 cm 90 cm 50 cm 100 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Imhoff cone is used to determine Suspended solids Settleable solids Dissolved solids None of these Suspended solids Settleable solids Dissolved solids None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A drop manhole is provided if A branch sewer joins the main sewer at higher level None of these A sewer drops from a height A lamp is inserted to check obstruction A branch sewer joins the main sewer at higher level None of these A sewer drops from a height A lamp is inserted to check obstruction ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dry water flow in a combined sewer, is Storm water Industrial sewage Domestic sewage Inclusive of domestic and industrial sewage but excludes storm water Storm water Industrial sewage Domestic sewage Inclusive of domestic and industrial sewage but excludes storm water ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Rate of flow of sewage is generally assumed Equal to the rate of water supply At 150 litres per capita Less than the rate of water supply More than the rate of water supply Equal to the rate of water supply At 150 litres per capita Less than the rate of water supply More than the rate of water supply ANSWER DOWNLOAD EXAMIANS APP