Waste Water Engineering depends upon The Chezy’s constant C in the formula V = C All listed here Roughness of sewer surface Size of the sewer Shape of the sewer All listed here Roughness of sewer surface Size of the sewer Shape of the sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bio-chemical oxygen demand (BOD) for the first 20 days in generally referred to First stage demand Carbonaceous demand Initial demand All of these First stage demand Carbonaceous demand Initial demand All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewerage system originates from Branch sewers Lateral sewers Main sewers House sewers Branch sewers Lateral sewers Main sewers House sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The first stage of neutral process of sludge digestion, is Alkaline fermentation Acid regression None of these Acid fermentation Alkaline fermentation Acid regression None of these Acid fermentation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a grit chamber, if the recommended velocity of flow is 0.2 m/sec and detention period is 2 minutes, the length of the tank, is 24 m 30 m 16 m 20 m 24 m 30 m 16 m 20 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum depth of sedimentation tanks, is kept 3.5 m 3 m 4 m 4.5 m 3.5 m 3 m 4 m 4.5 m ANSWER DOWNLOAD EXAMIANS APP