Waste Water Engineering The standard B.O.D. of water is taken for 1 day 5 days 2 days 3 days 1 day 5 days 2 days 3 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If D is the diameter of a circular sewer and D’ is the top horizontal diameter of an equivalent egg shaped section, the relationship which holds good, is D’ = 0.64 D D’ = 0.84 D D’ = 0.94 D D’ = 0.74 D D’ = 0.64 D D’ = 0.84 D D’ = 0.94 D D’ = 0.74 D ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The normal values of over flow rates for secondary sedimentation tanks, ranges between 80,000 to 10,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 80,000 to 10,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering With self cleansing velocity in sewers Both silting and scouring occur at bottom Neither silting nor scouring occurs at bottom Silting occurs at bottom Scouring occurs at bottom Both silting and scouring occur at bottom Neither silting nor scouring occurs at bottom Silting occurs at bottom Scouring occurs at bottom ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Water content of sewage is about 0.95 0.99 0.9 0.999 0.95 0.99 0.9 0.999 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the flame of a miner's safety lamp in the upper layers of the sewer forms an explosive, the sewer certainly contains Hydrogen sulphide Carbon dioxide Methane Oxygen Hydrogen sulphide Carbon dioxide Methane Oxygen ANSWER DOWNLOAD EXAMIANS APP