• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Waste Water Engineering

Waste Water Engineering
The standard B.O.D. of water is taken for

1 day
2 days
5 days
3 days

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The digested sludge from septic tanks, is removed after a maximum period of

3 years
4 years
5 years
3.5 years

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Primary treatment of sewage consists of removal of

Oil and grease
Sand and girt
Large suspended organic solids
Floating materials

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
If 2% solution of a sewage sample is incubated for 5 days at 20°C and depletion of oxygen was found to be 5 ppm, B.O.D. of the sewage is

225 ppm
None of these
250 ppm
200 ppm

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of

120 cm
160 cm
100 cm
140 cm

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
It is customary to design a sewer for D.W.F. on the basis of

Average demand
Twice the average demand
Four times the average demand
Thrice the average demand

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Waste Water Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑