Waste Water Engineering The standard B.O.D. of water is taken for 5 days 1 day 2 days 3 days 5 days 1 day 2 days 3 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of man holes along a straight portion of a sewer is 300 m, the diameter of the sewer may be 0.9 cm > 1.5 m 1.5 m 1.2 m 0.9 cm > 1.5 m 1.5 m 1.2 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the diameter of sewer is 225 mm, the gradient required for generating self cleansing velocity, is None of these 1 in 120 1 in 60 1 in 100 None of these 1 in 120 1 in 60 1 in 100 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In 1000 kg of sewage, the total solids approximate 7.5 kg to 10 kg 5 kg to 7.5 kg 0.5 to 1.0 kg 1 kg to 2.0 kg 7.5 kg to 10 kg 5 kg to 7.5 kg 0.5 to 1.0 kg 1 kg to 2.0 kg ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In case of sewer lines All listed here Obstruction test is carried out with the help of smooth ball of diameter 13 mm Water test is carried out to check water tightness of the joints Test for straightness is carried out with the help of a lamp and mirror All listed here Obstruction test is carried out with the help of smooth ball of diameter 13 mm Water test is carried out to check water tightness of the joints Test for straightness is carried out with the help of a lamp and mirror ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which one of the following resists hydrogen sulphide corrosion? Glazed stone wares R.C.C. Glazed ware Asbestos cement Glazed stone wares R.C.C. Glazed ware Asbestos cement ANSWER DOWNLOAD EXAMIANS APP