Waste Water Engineering An inverted siphon is designed generally for One pipe Four pipes Three pipes Two pipes One pipe Four pipes Three pipes Two pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is 6.5 m 5 m 7 m 5.5 m 6.5 m 5 m 7 m 5.5 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The bottom of the sewage inlet chamber of septic tanks, is provided an outward slope 1 in 10 1 in 20 1 in 15 1 in 5 1 in 10 1 in 20 1 in 15 1 in 5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering With self cleansing velocity in sewers Both silting and scouring occur at bottom Silting occurs at bottom Neither silting nor scouring occurs at bottom Scouring occurs at bottom Both silting and scouring occur at bottom Silting occurs at bottom Neither silting nor scouring occurs at bottom Scouring occurs at bottom ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For large sewers, maximum distance between manholes may be 200 m 300 m 50 m 100 m 200 m 300 m 50 m 100 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For treating the sewage of a large city, you will recommend Sedimentation tanks with high rate trickling filters None of these A plant consisting of Imhoff tanks with low rate trickling filters A sedimentation tank and an activated sludge treatment plant Sedimentation tanks with high rate trickling filters None of these A plant consisting of Imhoff tanks with low rate trickling filters A sedimentation tank and an activated sludge treatment plant ANSWER DOWNLOAD EXAMIANS APP