Waste Water Engineering The ratio of maximum sewage flow to average sewage flow for mains up to 1 m in diameter, is 4 2 3 1.5 4 2 3 1.5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For efficient working of a sewer, it must be ensured that Both (A) and (B) Minimum velocity of 0.45 m/sec, is maintained at its minimum flow Neither (A) nor (B) A maximum velocity of 0.90 m/sec, is maintained at its maximum flow Both (A) and (B) Minimum velocity of 0.45 m/sec, is maintained at its minimum flow Neither (A) nor (B) A maximum velocity of 0.90 m/sec, is maintained at its maximum flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a grit chamber of a sewage treatment plant, Depth of 0.9 m to 1.20 m is kept All of these One minute of detention period is kept Flow velocity 0.15 m to 0.3 m/sec is kept Depth of 0.9 m to 1.20 m is kept All of these One minute of detention period is kept Flow velocity 0.15 m to 0.3 m/sec is kept ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The layers of vegetable wastes and night soil alternatively piled above the ground to form a mound, is called Plateau A heap Windrow None of these Plateau A heap Windrow None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Rate of flow of sewage is generally assumed At 150 litres per capita Less than the rate of water supply More than the rate of water supply Equal to the rate of water supply At 150 litres per capita Less than the rate of water supply More than the rate of water supply Equal to the rate of water supply ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer manholes are generally provided at The change of gradient The junctions of sewers The change of direction All of these The change of gradient The junctions of sewers The change of direction All of these ANSWER DOWNLOAD EXAMIANS APP