Waste Water Engineering The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is 2 hours 30 minutes 1 hour 1 hour and 30 minutes 2 hours 30 minutes 1 hour 1 hour and 30 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Disposal to sewage in large cities, is done in Irrigation Dilution Oxidation Purification Irrigation Dilution Oxidation Purification ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the pH value of sewage is 7 It is alkaline None of these It is neutral It is acidic It is alkaline None of these It is neutral It is acidic ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at Three fourth full Full depth Two third full Half full Three fourth full Full depth Two third full Half full ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Large diameter sewers subjected to external pressure alone, are reinforced With elliptical cage Near the inner surface of the pipe Near the outer surface of the pipe Both A and B With elliptical cage Near the inner surface of the pipe Near the outer surface of the pipe Both A and B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 2 days 7 days 14 days 12 days 2 days 7 days 14 days 12 days ANSWER DOWNLOAD EXAMIANS APP