Waste Water Engineering The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is 1 hour 2 hours 30 minutes 1 hour and 30 minutes 1 hour 2 hours 30 minutes 1 hour and 30 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a sedimentation tank (length L, width B, depth D) the settling velocity of a particle for a discharge Q, is Q/(B × L) Q/L Q/(B × D) Q/(L × D) Q/(B × L) Q/L Q/(B × D) Q/(L × D) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A safety lamp when inserted in the upper portion of a manhole causes flames. It indicates the presence of Petrol vapours Methane gas Hydrogen sulphide gas Carbondioxide gas Petrol vapours Methane gas Hydrogen sulphide gas Carbondioxide gas ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of bars of perforations of fine screens used for the treatment of sewage, is 5 to 8 mm 8 to 10 mm 3 to 5 mm 2 to 3 mm 5 to 8 mm 8 to 10 mm 3 to 5 mm 2 to 3 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Stone ware pipes are Highly resistant to sulphide corrosion Hydraulically efficient because of their smooth interior surface Highly impervious Especially suited to pressure pipes Highly resistant to sulphide corrosion Hydraulically efficient because of their smooth interior surface Highly impervious Especially suited to pressure pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 14 days 7 days 2 days 12 days 14 days 7 days 2 days 12 days ANSWER DOWNLOAD EXAMIANS APP