Waste Water Engineering Bottom openings 15 cm × 15 cm in the standing baffle wall are provided 22.5 cm c/c 15 cm c/c 30 cm c/c 50 cm c/c 22.5 cm c/c 15 cm c/c 30 cm c/c 50 cm c/c ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The first stage of neutral process of sludge digestion, is Acid fermentation None of these Alkaline fermentation Acid regression Acid fermentation None of these Alkaline fermentation Acid regression ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewerage system originates from House sewers Lateral sewers Main sewers Branch sewers House sewers Lateral sewers Main sewers Branch sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sludge does not contain waste water from Wash basins Bath rooms Kitchen sinks Toilets Wash basins Bath rooms Kitchen sinks Toilets ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which received discharge from two or more main sewers, is known as An intercepting sewer A main sewer A trunk sewer An outfall sewer An intercepting sewer A main sewer A trunk sewer An outfall sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In primary sedimentation, the 0.2 mm inorganic solids get separated if specific gravity is 2.5 2.65 2.55 2.25 2.5 2.65 2.55 2.25 ANSWER DOWNLOAD EXAMIANS APP