Waste Water Engineering Bottom openings 15 cm × 15 cm in the standing baffle wall are provided 15 cm c/c 50 cm c/c 30 cm c/c 22.5 cm c/c 15 cm c/c 50 cm c/c 30 cm c/c 22.5 cm c/c ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the length of overland flow from the critical point to the mouth of drain is 13.58 km and difference in level between the critical point and drain mouth is 10 m, the inlet time is 6 hours 8 hours 4 hours 2 hours 6 hours 8 hours 4 hours 2 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum spacing of manholes specified by Indian standard in sewers upto 0.3 m diameter is 45 m 20 m 75 m 30 m 45 m 20 m 75 m 30 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a residential colony, sewers of diameters 100 mm, 150 mm and 225 mm were laid with a gradient 1 in 120. Which portion of the sewage system does not choke in due course of time? 100 mm dia 225 mm dia 150 mm dia All of these 100 mm dia 225 mm dia 150 mm dia All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For efficient working of a sewer, it must be ensured that Minimum velocity of 0.45 m/sec, is maintained at its minimum flow Neither (A) nor (B) A maximum velocity of 0.90 m/sec, is maintained at its maximum flow Both (A) and (B) Minimum velocity of 0.45 m/sec, is maintained at its minimum flow Neither (A) nor (B) A maximum velocity of 0.90 m/sec, is maintained at its maximum flow Both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for A particle to travel along its length A particle to travel from top surface to bottom sludge zone None of these The flow of sewage to fill the tank A particle to travel along its length A particle to travel from top surface to bottom sludge zone None of these The flow of sewage to fill the tank ANSWER DOWNLOAD EXAMIANS APP