Waste Water Engineering In R.C. sewer pipes, the percentage longitudinal reinforcement to the cross-sectional area of concrete is kept 10 5 0.25 2 10 5 0.25 2 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For the COD test of sewage, organic matter is oxidised by K₂Cr₂O₇ in the presence of None of these HCl HNO₃ H₂SO₄ None of these HCl HNO₃ H₂SO₄ ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Inter-distance between ventilation columns in a sewer line is kept 50 m to 100 m 150 m to 300 m 100 m to 150 m 25 to 50 m 50 m to 100 m 150 m to 300 m 100 m to 150 m 25 to 50 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewers designed with self cleansing velocity, Both silting and scouring occur at the bottom The bottom is scoured The bottom is silted Neither silting nor scouring occurs at the bottom Both silting and scouring occur at the bottom The bottom is scoured The bottom is silted Neither silting nor scouring occurs at the bottom ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 5 to 10 1 3 to 5 2 to 3 5 to 10 1 3 to 5 2 to 3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 16 to 24 hours 8 to 16 hours 24 to 36 hours 4 to 8 hours 16 to 24 hours 8 to 16 hours 24 to 36 hours 4 to 8 hours ANSWER DOWNLOAD EXAMIANS APP