In R.C. sewer pipes, the percentage longitudinal reinforcement to the cross-sectional area of concrete is kept

10
5
0.25
2

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
For the COD test of sewage, organic matter is oxidised by K₂Cr₂O₇ in the presence of

None of these
HCl
HNO₃
H₂SO₄

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Inter-distance between ventilation columns in a sewer line is kept

50 m to 100 m
150 m to 300 m
100 m to 150 m
25 to 50 m

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
In sewers designed with self cleansing velocity,

Both silting and scouring occur at the bottom
The bottom is scoured
The bottom is silted
Neither silting nor scouring occurs at the bottom

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The design period in years for pumping plants, is

5 to 10
1
3 to 5
2 to 3

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The detention period for plain sedimentation water tanks, is usually

16 to 24 hours
8 to 16 hours
24 to 36 hours
4 to 8 hours

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Waste Water Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑