Waste Water Engineering If the discharge of a sewer running half is 628 1.p.s., i = 0.001, and n = 0.010, the diameter of the sewer, is 1.49 m 1.39 m 1.59 m 1.69 m 1.49 m 1.39 m 1.59 m 1.69 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The effluent of a septic tank is Fit for discharge into any open drain None of these Foul and contains dissolved and suspended solids As good as that from a complete treatment Fit for discharge into any open drain None of these Foul and contains dissolved and suspended solids As good as that from a complete treatment ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A five day B.O.D. at 15°C of the sewage of a town is 100 kg/day. If the 5 day B.O.D. per head at 15°C for standard sewage is 0.1 kg/day, the population equivalent is 1000 100 10000 5000 1000 100 10000 5000 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For estimating the peak run off the rational formula Q = 0.0278 KpA was evolved by All listed here Lloyd Davis Frubling Kinchling All listed here Lloyd Davis Frubling Kinchling ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewers designed with self cleansing velocity, The bottom is scoured Both silting and scouring occur at the bottom The bottom is silted Neither silting nor scouring occurs at the bottom The bottom is scoured Both silting and scouring occur at the bottom The bottom is silted Neither silting nor scouring occurs at the bottom ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For design of sewers, percentage of sewage discharge is assumed 0.85 65 to 70% 70 to 75% 75 to 80% 0.85 65 to 70% 70 to 75% 75 to 80% ANSWER DOWNLOAD EXAMIANS APP