Waste Water Engineering If the discharge of a sewer running half is 628 1.p.s., i = 0.001, and n = 0.010, the diameter of the sewer, is 1.59 m 1.49 m 1.39 m 1.69 m 1.59 m 1.49 m 1.39 m 1.69 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The porosity of sediments in sewer pipes, is usually taken as 0.013 0.01 0.011 0.012 0.013 0.01 0.011 0.012 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which one of the following tests is used for testing sewer pipes? Water test All of these Mirror test Ball test Water test All of these Mirror test Ball test ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a trickling filter Both A and B Biological action is used Filtration process is used Neither A nor B Both A and B Biological action is used Filtration process is used Neither A nor B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the length of overland flow from the critical point to the mouth of drain is 13.58 km and difference in level between the critical point and drain mouth is 10 m, the inlet time is 2 hours 8 hours 4 hours 6 hours 2 hours 8 hours 4 hours 6 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering ‘Cowl’ is provided at Lower end of ventilating column Upper end of ventilating column Upper end of the manhole First step in manhole Lower end of ventilating column Upper end of ventilating column Upper end of the manhole First step in manhole ANSWER DOWNLOAD EXAMIANS APP