Waste Water Engineering If D.O. concentration falls down to zero in any natural drainage, it indicates the zone of Recovery Active decomposition Cleaner water Degradation Recovery Active decomposition Cleaner water Degradation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 2 days 7 days 14 days 12 days 2 days 7 days 14 days 12 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which one of the following gases is most significant as air pollutant? Carbondioxide Oxygen Sulphur-dioxide Nitrogen Carbondioxide Oxygen Sulphur-dioxide Nitrogen ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For the survival of fish in a river stream, the minimum dissolved oxygen is prescribed 5 ppm 4 ppm 3 ppm 10 ppm 5 ppm 4 ppm 3 ppm 10 ppm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a peak discharge of 0.0157 cumec, with a velocity of 0.9 m/sec, the diameter of the sewer main, is 10 cm 12 cm 18 cm 15 cm 10 cm 12 cm 18 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The minimum diameter of sewer to be adopted is 12.5 cm 25 cm 10 cm 15 cm 12.5 cm 25 cm 10 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP