Waste Water Engineering The normal values of over flow rates for secondary sedimentation tanks, ranges between 25,000 to 35,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 80,000 to 10,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 80,000 to 10,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For drainage pipes in buildings the test applied before putting them to use, is All listed here Water test Straightness test Smoke test All listed here Water test Straightness test Smoke test ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Discrete or granular particles change their Weight None of these Size Shape Weight None of these Size Shape ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The standard B.O.D. of water is taken for 5 days 1 day 2 days 3 days 5 days 1 day 2 days 3 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A five day B.O.D. at 15°C of the sewage of a town is 100 kg/day. If the 5 day B.O.D. per head at 15°C for standard sewage is 0.1 kg/day, the population equivalent is 1000 10000 100 5000 1000 10000 100 5000 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In normal conditions, the period for sludge digestion, is 10 days 20 days 60 days 30 days 10 days 20 days 60 days 30 days ANSWER DOWNLOAD EXAMIANS APP