Waste Water Engineering Large diameter sewers subjected to external pressure alone, are reinforced Near the inner surface of the pipe With elliptical cage Both A and B Near the outer surface of the pipe Near the inner surface of the pipe With elliptical cage Both A and B Near the outer surface of the pipe ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In areas where rainy season is limited to a few months, the type of sewerage system recommended is None of these Partially separate system Separate system Combined system None of these Partially separate system Separate system Combined system ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum diameter of sewers adopted in the designs is 2.0 m 3.0 m 4.0 m 1.0 m 2.0 m 3.0 m 4.0 m 1.0 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Primary treatment of sewage consists of removal of Floating materials Oil and grease Sand and girt Large suspended organic solids Floating materials Oil and grease Sand and girt Large suspended organic solids ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the length of overland flow from the critical point to the mouth of drain is 13.58 km and difference in level between the critical point and drain mouth is 10 m, the inlet time is 2 hours 6 hours 4 hours 8 hours 2 hours 6 hours 4 hours 8 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Clogging of sewers, is caused due to Greasy and oily matters Silting All of these Low discharge Greasy and oily matters Silting All of these Low discharge ANSWER DOWNLOAD EXAMIANS APP