Waste Water Engineering Large diameter sewers subjected to external pressure alone, are reinforced Near the outer surface of the pipe Both A and B With elliptical cage Near the inner surface of the pipe Near the outer surface of the pipe Both A and B With elliptical cage Near the inner surface of the pipe ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The first stage of neutral process of sludge digestion, is None of these Acid fermentation Alkaline fermentation Acid regression None of these Acid fermentation Alkaline fermentation Acid regression ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewage, the solids in mg per litre is 100 to 500 500 to 1000 1000 to 1500 1500 to 2000 100 to 500 500 to 1000 1000 to 1500 1500 to 2000 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In septic tanks, The clear space between the baffle top and covering slab is about 7.5 cm The baffles or tees are extended up to top level of scum All listed here Free board of 0.3 m may be provided The clear space between the baffle top and covering slab is about 7.5 cm The baffles or tees are extended up to top level of scum All listed here Free board of 0.3 m may be provided ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 7 days 14 days 12 days 2 days 7 days 14 days 12 days 2 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In areas where rainy season is limited to a few months, the type of sewerage system recommended is Separate system None of these Combined system Partially separate system Separate system None of these Combined system Partially separate system ANSWER DOWNLOAD EXAMIANS APP