Waste Water Engineering The water carried sewerage system removes Storm sewage Industrial sewage All listed here Domestic sewage Storm sewage Industrial sewage All listed here Domestic sewage ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Disposal to sewage in large cities, is done in Oxidation Dilution Purification Irrigation Oxidation Dilution Purification Irrigation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bio-chemical oxygen demand (BOD) for the first 20 days in generally referred to Initial demand All of these Carbonaceous demand First stage demand Initial demand All of these Carbonaceous demand First stage demand ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for None of these A particle to travel from top surface to bottom sludge zone A particle to travel along its length The flow of sewage to fill the tank None of these A particle to travel from top surface to bottom sludge zone A particle to travel along its length The flow of sewage to fill the tank ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering R.M.O. expenses include Operation expenses Running expenses All of these Maintenance expenses Operation expenses Running expenses All of these Maintenance expenses ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering House connections to the laterals is generally made by Cast iron Glazed stonewares P.C.C. R.C.C. Cast iron Glazed stonewares P.C.C. R.C.C. ANSWER DOWNLOAD EXAMIANS APP